Intergenerauonal Recreation Center Page -3- <br />AACE Proposal No. P14-392 <br />Proposed Testing Frequency <br />Unless otherwise requested, the following in-place density testing frequencies will be used for the subject project (based on <br />the accepted industry standard for projects such as TMC). <br />Mass Site Fill <br />Natural Ground - 1 test performed 1 foot into natural ground (after stepping and grubbing) per 5,000 square feet; <br />Embankment/Filled Area - 1 test per 5,000 square feet, per lift of fill, <br />Roadways: <br />Stabilized Subgrade - 1 test per 200 lineal feet, per travel direction; <br />Base Course - 1 test (1 lift except for entrance road - 2 lifts) per 200 lineal feet, per travel direction, <br />Curb pads - 1 test per 200 lineal feet; <br />Sidewalks - 1 test per 200 lineal feet, per 12 -inch lift of embankment; <br />Parking Lot: <br />Natural Ground - 1 test performed 1 foot into natural ground (after stepping and grubbing) per 5,000 square feet; <br />Embankment/Filled Area - 1 test per 5,000 square feet, per lift of fill; <br />Stabilized Subgrade - 1 test per 5,000 square feet; <br />Base Course - 1 test (assuming base constructed in one lift) per 5,000 square feet; <br />Buildings: <br />Pad Fill - 1 test per 2,000 square feet, per lift of fill; <br />Continuous Footings - 1 test performed 1 foot into bottom of footing excavation per every 50 feet of footing; <br />Column/Isolated Footings - Minimum of 1 test performed 1 foot into bottom of footing excavation per footing; <br />Drainage: <br />Structures - One (1) test per hft of backfill, from bottom of structure to top of structure. (Fill placed on all sides <br />of structure is probed with a manual probe rod to confirm uniform compacuve effort); <br />Piping - 1 test per 200 lineal feet (or per backfill/open cut operation) per lift along side of pipe to top -of -pipe, then <br />every 1 foot of fill atop pipe thereafter; <br />Utilities: <br />Sanitary Sewer Pipe -1 test per 200 lineal feet (or per backfill/open cut operation) per hft along side of pipe to top - <br />of -pipe, then every 1 foot of fill atop pipe thereafter; <br />Water Main - 1 test per 200 lineal feet of pipe (or per backfill/open cut operation) per lift from top -of -pipe to <br />finished grade + 1 test per 200 lineal feet for pipe bedding We have assumed a maximum of 3 feet of cover for <br />water main backfill; <br />Misc. Electrical/Plumbing/Irrigation/LT Conduit - 1 test per 200 lineal feet of pipe (or per backfill/open cut <br />operation) per lift from top -of -pipe to finished grade. <br />Concrete/Grout Testing; <br />A minimum of one set of four (4) cylinders will be made for every pour, and for each 50 cubic yards for larger <br />pours; <br />One slump test will be performed for every pour, and for each 50 cubic yards for larger pours, <br />