My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-022
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 1:58:37 PM
Creation date
4/25/2016 2:09:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/10/2015
Control Number
2015-022
Agenda Item Number
8.N.
Entity Name
MBV Engineering
Subject
Work Order No.1 East Gifford Drainage
Area
41st. to 43rd. Street
Project Number
1502
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4 COUNTY REVIEWS <br />CONSULTANT will attend three (3) progress review meetings with Engineering Division staff at <br />approximately 60, 90 and 100 percent levels of design completion. A single set of review comments shall <br />be provided to CONSULTANT from Engineering Division staff prior to each review meeting. <br />TASK 3 —PERMITTING/ BIDDING SERVICES <br />CONSULTANT will prepare the following permit applications and associated submittals for the following <br />agencies: <br />• Indian River County ROW Permit <br />• Indian River County Land Clearing Permit <br />• Indian River County Tree Removal Permit (if required) <br />No wetlands, endangered species or other ecological permitting is anticipated or included herein. <br />CONSULTANT shall respond to up to one (1) request for additional information by each of the permitting <br />agencies. <br />County will be responsible for all permit fees. <br />The County shall be responsible for setting the bid opening date, advertisement of the bid, scheduling the <br />pre-bid meeting and scheduling the bid opening. The CONSULTANT will prepare a .pdf of the bid <br />documents for the County's use in distributing bid documents to prospective bidders via Demand Star. <br />DELIVERABLES <br />CONSULTANT shall provide the following: <br />• One (1) hard copy (24" x 36") of bid documents Final Drawings <br />• One (1) hard copy (11" x 17") of bid documents Final Drawings <br />• One (1) PDF electronic copy of bid documents (drawings and specifications) <br />• Technical Responses for one addenda as required for clarifying responses from pre-bid meeting <br />• Bid Award Recommendation Letter <br />SCHEDULE: <br />The services described herein will be provided based on the following number of days from the County <br />issuing the Notice to Proceed (NTP), unless otherwise noted: <br />TASKS 1 — 2 50 days from NTP <br />TASK 3 90 days from NTP <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.