Laserfiche WebLink
CONE PENETROMETER.TESTING <br />0 - 1501 ................................................. 4.00/ft. <br />Mobilization and Demobilization <br />(25 mi. radius) ....................................... 100.00 i.s. <br />ROC{ CORING <br />NW Core Barrel - 2" Core: <br />0 - 50'....... ............................ <br />10.00 to 12.00/ft. <br />30 - ,5' ............................ ........ <br />12.00 to 15.0�%"=t . <br />- <br />'3 - 01....... ......... ............ <br />�.00r'01.: <br />___ 1 ...... ................ ........ <br />_1.00 -o 2 . <br />............. *:"**,*"* "**................ <br />Demobi1j Zati: n <br />(To be negotiated, will be dependent <br />upon scope of work and ee_uiTDment to <br />be used.) <br />PQ Wireline - 3 5/16" Core: <br />0 - 100' .............................................. <br />14.00/ft. <br />Mobilization and Demobilization <br />(To be negotiated, will be dependent <br />upon scope of work and equipment to <br />be used.) <br />Core Boxes: <br />LargeWood ............................................ <br />40.00 ea. <br />Cardboard............................................. <br />10.00 ea. <br />..BORINGS OVER WATER <br />The unit prices for the required drilling and sampling will be based <br />on the following: total footage, depth of water, protected or un- <br />protected water, distance between borings, currents, and need for I <br />suczort. <br />FRASC'R ENGINEERING AND TFSTING. INC <br />e <br />Commissioner Bird asked if we have an overall approved <br />budget for this project. <br />Public Works Director Davis advised that testing was in- <br />cluded in the four million dollar budget submitted to the Board <br />about two years ago. The budget, however, did not include <br />right-of-way acquisition as staff had no idea of the cost. <br />Commissioner Wodtke wished to know if Fraser is pretty well <br />in line with their fee schedule, and Director Davis confirmed <br />that they are very well in line, and, in fact, under what most <br />outside companies would charge coming into this area. He <br />advised that most of the testing that will be done is the density - <br />testing, which is $12.50 per test, and they will be using the <br />Florida Bearing Value test at $15.00 rather than the Limerock <br />Bearing Ratio test at $150. <br />AUG 6 1986 <br />23 <br />BOOK 6 5 dart 2.94 <br />