My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 11:53:30 AM
Creation date
4/26/2016 12:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 1
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13K: 282,`.i.PG: 1322 <br />PUBLIC CONSTRUCTION BOND <br />Bond No. 6086201 <br />(enter bond number) <br />BY THIS BOND, We Timothy Rose Contracting. Inc. , as Principal and Westfield <br />Insurance_Cnronany;, , a corporation, as Surety, are bound to Indian River County. Florida <br />,herein called Owner, In the sum of $ 129,200.52 , for payment of which we <br />bind ourselves, our heir;, personal representatives, successors, and assigns, Jointly and <br />severally. <br />THE CONDITION OF THiS BOND Is that If Principal: <br />1. Performs the contract dated Feb 1 Rth , 7n 1 s , between Principal and Owner for <br />construction of Old Dixie Hwy Sidewalk Improvements 38th Lane to 45th Street, the contract being <br />made a part of this bond by reference, at the times and in the manner prescribed in the <br />contract; and <br />2. Promptly makes payments to all claimants, as defined In Section 255,05(1), Florida <br />Statutes, supplying Principal with labor, materials, or supplies, used directly or indirectly <br />by Principal in the prosecution of the work provided for in the contract and <br />3. Pays Owner all losses, damages, expenses, costs, and attomey's fees, including <br />appellate proceedings, that Owner sustains because of a default by Principal under the <br />contract and <br />4. Performs the gudrantee of all work and materials furnished under the contract for the <br />time specified In the contract, then this bond is void; otherwise it remains In full force. <br />.Any action instituted by a •claimant under this bond for payment must be In accordance <br />with the notice and time limitation provisions In Section 255.05(2), Florida Statutes. <br />Any changes In or under the contract documents and compliance or noncompliance <br />with any formalities connected with the contract or the changes does not affect Surety's <br />obligation under this bond. <br />DATED ON February 1 R, 7(115 <br />00610 - 3 <br />Timothy Rose Contracting. Inc. <br />f Name of Principal <br />By <br />(As Attorney in Fact) Cabot W. Lord <br />Westfield Insurance Company <br />(Name of Suretyl <br />00610 - Public Construction Bond.doc <br />FAPubik works\ ENGINEERING DIVISION PROJECTSt08458.Old Dbde Hwy Sidewalk (38th Ln - 45th SOAdmInAbld <br />doamrentslMaster Contract Doamrents100810 - Public Construction Bond.doc <br />A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />
The URL can be used to link to this page
Your browser does not support the video tag.