My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 11:53:30 AM
Creation date
4/26/2016 12:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 1
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County <br />CONTRACTOR. <br />Project No.: 0845B <br />FM No. 423186-2-58-01 <br />Project Description: The project will consist of the construction of a 5' wide concrete sidewalk <br />along the east side of Old Dixie Highway between 38'h Lane and 45th Street, a gross length of <br />approximately 4,500 linear feet. <br />OWNER's Bid No 2014032 <br />CONTRACT FOR Old Dixie Highway Sidewalk Improvements, 38th Lane to 45th Street <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To. <br />OWNER <br />And To. <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within days <br />of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07 doc <br />00630 - 1 <br />F'Public Works\ENGINEERING DIVISION PROJECTS 084513 - Old Dixie Hwy Sidewalk (38th Ln - 45th St)V\dmim\bid documents\Master Contract Documents100630 - <br />Certificate of Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.