My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 11:53:30 AM
Creation date
4/26/2016 12:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 1
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLARIFICATIONS / CORRECTIONS/ADDITIONS/QUESTIONS: <br />Pre-bid meeting — questions: <br />QUESTION: Can the sidewalk be closed during construction? <br />ANSWER: The sidewalk can be closed during construction. <br />QUESTION: Does a temporary sidewalk need to be in place for the existing segments of sidewalk? <br />ANSWER: Because the existing sidewalk segments are not continuous, both the existing sidewalks within the <br />project area and proposed sidewalks can be closed during construction. No temporary sidewalk will need to be in <br />place during construction. <br />QUESTION: Does the Contractor need to be FDOT Certified? <br />ANSWER: NO <br />QUESTION: Does the concrete need to be from a FDOT Certified Plant? <br />ANSWER: No <br />QUESTION: Is there a preferred end of the sidewalk to start on? <br />ANSWER: The preferred end to start construction is at 45th Street. Once the segment between 45th Street and 41s` <br />Street is complete, It is preferred to open this segment to allow school access in the area. <br />QUESTION: Is a pre -construction conditions video required? If so, is a third party required to take it? <br />ANSWER: The CONTRACTOR shall make provisions, at his expense, for photographs and video tapes of all work <br />areas just prior to construction, and for unusual conditions during construction. The photographs and videos shall <br />show pertinent physical features along the line of construction. The purpose of the videos is to determine any <br />damage to private or public property during construction. The video must be performed by a professional <br />videographer. (See Section 01215 GENERAL QUALITY CONTROL, Division 1 GENERAL REQUIREMENTS of the <br />Contract Documents). <br />QUESTION: What happens in event of rain delays? <br />ANSWER: In the event of rain delays, when mutually agreed upon by county and Contractor, additional time to the <br />contract time can be added. <br />QUESTION: What are the work hours? <br />ANSWER: Work hours are from 7:OOam to 5:OOpm, Monday through Friday, except holidays. (See SC6.02Bof <br />Section 00800 -Supplementary Conditions the General Conditions in the Contract Documents) <br />CLARIFICATION <br />Line Item 527-1 DETECTABLE WARNING ON EXISTING WALKING SURFACES QUANTITY 8, is intended for use on <br />existing walking surfaces. All other detectable warnings and curb cuts are included in the cost of the proposed <br />sidewalk as indicated on the construction drawings. <br />The Federal —Aid Project Wage Rates in the Contract Documents are current. <br />ATTACHMENT: Pre-bid meeting minutes dated October 22, 2014 <br />Page 2 of 3 <br />F'Public Works\ENGINEERJNG DIVISION PROJECTS \08458 - Old Dixie Hwy Sidewalk (38th Ln - 45th St)\Admim\bid documents \Addendums\Addendum No.l, IO.22-20I4.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.