My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 11:53:30 AM
Creation date
4/26/2016 12:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 1
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Environmental permits are exempt. <br />• Coordination with business owners. <br />• Sidewalk —true 6" concrete, 2% max slope (no tolerance). <br />• Testing per- FDOT specifications. <br />• Curb cut ramps in accordance with FDOT Index. <br />• School buses, Sanitation & US Postal Service must be maintained. <br />• Addendums if required — review and comment as soon as possible, no further comments <br />/ questions 10 days prior to bid opening (Sunday, November 2, 2014). <br />FEDERAL REQUIREMENTS: <br />• Invoicing <br />• Indian River County (IRC) is required to satisfy the Federal reporting requirements for <br />this project, such as employment reporting, for both Contractor and all Subcontractors. <br />• In order to be eligible for reimbursement by FDOT /FHWA, IRC must comply with all <br />applicable procedures, standards and directives as described in the FDOT Local Agency <br />Program Manual and the Florida Department of Transportation, Equal Employment <br />Opportunity Construction Contract Compliance Workbook, Jan. 2012. <br />• Contractors must meet deadlines in order to be in compliance. All deadlines are strictly <br />enforced or reimbursements cannot be made. <br />• All required forms must be completed and on time or payment could be withheld. <br />• Job Site Bulletin Board is required to be maintained until project is completed. <br />• Summary of required contractor form submittals checklist (Section 200-8 in contract <br />documents). <br />• Current Wage Determination. * Please Note Common/General Laborer Rates <br />(County will verify latest Wage Rates — will send out in addendum if different). <br />• FLORIDA DEPARTMENT OF TRANSPORTATION, EQUAL EMPLOYMENT OPPORTUNITY CONSTRUCTION <br />CONTRACT COMPLIANCE WORKBOOK, JAN. 2014 <br />Available on website: www.dot.state.fl.us/equalopportunity/ <br />DISCUSSION: <br />Questions: Can the sidewalk be closed during construction? <br />Does a temporary sidewalk need to be in place for the existing segments of sidewalk? <br />Does the Contractor need to be FDOT Certified? <br />Does the concrete need to be from a FDOT Certified Plant? <br />Is there a preferred end of the sidewalk to start on? <br />Is a pre -construction conditions video required? If so, is a third party required to take it? <br />What happens in event of rain delays? <br />What are the work hours? <br />Questions will be addressed in Addendum No. 1 <br />No curbing is required with this project. There is a grass strip between the edge of pavement and <br />sidewalk. Grassing will need to be placed if it does not exist. There is a line item for Performance Turf to <br />cover this item. <br />Certified payroll with wage rates will be required to be submitted by the contractor. Bulletin Board, EEO <br />for all subs over $10,000, FH 1273 must be included in all contracts. DBE participation is encouraged. <br />ATTACHED: <br />Sign in Sheet <br />r ;Public \Vorks.ENGINEERING DIVISION PROJECTS`.0815B - Old Dixie Hwv Sidewalk (38th Ln - -51h St r\dmim _Vleetings\Pre-BidP.Pre-hid meeting minutes for IO-22-1S.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.