My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 11:53:30 AM
Creation date
4/26/2016 12:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 1
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />CONFIDENTIAL <br />11 <br />SECTION 00496 <br />gf,0-E.12F FLORIDA DEPARTMENT OF TRANSPORTATION <br />LAP CERTIFICATION .OF CURRENT CAPACITY <br />FPI' bids tube received on I t. k <br />(Lptting 'bate). <br />52-00-z6 <br />PRODUCTION SUPPORT <br />1?fCP <br />Page 1 of 2 <br />VF <br />Fill, in. your MOT Vendor Number <br />"(nlyapplicab1e 0,FDQT:151P-qwajifiod cpri_trp.ctp[s) <br />CERTIFICATE <br />I hereby certify that the PrnP-vrl(PfPr2Y:Pr9PP§P!.-Ppdmitted-;'by this bidder'ldrthe-abi)ve letting' dPes. not exceed the amount <br />,of-thq FinreS CURRENT CAPACITY (rriakirntith Capacity- rating lesslOtal UnbomPleted(WOrk). <br />Thelotal: uncompleted worlc:as shown on <br />-tStefus,of'Contracts on Hand" reportIpage 2): -1.q.91-13-33 <br />I further certifythailhe "Stattis,of Contracts on Hand" report i(page 2Ywasprepered asif011ows: <br />1. -11 the letting is beforethe 251 day,of the month, the certificate and report refleettheftThOcirnpieted.Wcii-k.eS Of:the.15' <br />dayOUthe fnonth, laSt.pretalifig!thertiOnth blthd letting. <br />2. if the tatting is attorthe,$tb-40y Of the month,.(hecertificateend.report reflects the uncompleted work in progress as of <br />The 151h dayofthe rnpntr“)ttp jetting. <br />3. All new contracts (and subcontracts) awarded earlier than five days before theletting date are included in the report: <br />end.tharged against bortotai rating. <br />certify that.the inftinti abOVe is <br />'SWOrrilO and StibStribed tfiisti day <br />Of KIC).1 , It+ <br />- DEBORAH WEST <br />COMMISSION <br />1 <br />EXPIRES. OctoZzg 02014 <br />IvfY !I ainli:0 <br />,AncoTnetwotrzyjowthi tofttmottuy..+Diuzrzevntiv: <br />_ t wvo Jn.e _ <br />OF Emm <br />.By: <br />09496 - 1 <br />C Cri <br />Title <br />
The URL can be used to link to this page
Your browser does not support the video tag.