Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Timothy Rose Contracting, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1 01 CONTRACTOR shall complete all Work as specified <br />Documents. The Work is generally described as follows. <br />The project will consist of the construction of a 5' wide <br />east side of Old Dixie Highway between 38th Lane and <br />approximately 4,500 linear feet. <br />or indicated in the Contract <br />concrete sidewalk along the <br />45th Street, a gross length of <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows. <br />Project Name. Old Dixie Highway Sidewalk Improvements, 38th Lane to 45th <br />Street <br />County Project Number 0845B <br />FM Number: 423186-2-58-01 <br />Bid Number: 2014032 <br />Project Address: Old Dixie Highway from 38th Lane to 45th Street, Indian River <br />County, FL <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 60th day after the date when the <br />Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph <br />00520 - Agreement (Public Works) FOR LAP PROJECTS - FOR CONTRACTOR <br />00520 - 2 <br />F\Purchasing\Bids\2013-2014 FY (2014000)12014032 Old Dixie Hwy Sidewalks \00520 - Agreement (Public Works) FOR LAP PROJECTS - FOR CONTRACTOR.doc <br />