My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.07 Patent Fees and Royalties ........ ...................... ....22 <br />6.08 Permits. .22 <br />6 09 Laws and Regulations . . .22 <br />6.10 Taxes ... ...... ....... .22 <br />6.11 Use of Site and Other Areas .22 <br />6.12 Record Documents . .................... 23 <br />6 13 Safety and Protection . ........... ..... . ............ 23 <br />6 14 Safety Representative ................. 24 <br />6.15 Hazard Communication Programs .. 23 <br />6.16 Emergencies . .24 <br />6.17 Shop Drawings and Samples .24 <br />6.18 Continuing the Work .25 <br />6.19 CONTRACTOR's General Warranty and Guarantee 25 <br />6.20 Indemnification 26 <br />ARTICLE 7 - OTHER WORK 26 <br />7 01 Related Work at Site 26 <br />7.02 Coordination .27 <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES ..27 <br />8.01 Communications to Contractor .... .. ..27 <br />8 02 Replacement of ENGINEER ....27 <br />8.03 Fumish Data.. 27 <br />8.04 Pay Promptly When Due . ....... ..27 <br />8.05 Lands and Easements; Reports and Tests ..........27 <br />8.06 Insurance . 28 <br />8 07 Change Orders.. .28 <br />8 08 Inspections, Tests, and Approvals ... . ..... .......... ...28 <br />8.09 Limitations on OWNER's Responsibilities . 28 <br />8.10 Undisclosed Hazardous Environmental Condition 28 <br />8 11 Evidence of Financial Arrangements . 28 <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION .. ......................... 28 <br />9 01 OWNER'S Representative ............................ 28 <br />9 02 Visits to Site ... . 28 <br />9.03 Project Representative ...................... 28 <br />9 04 Clarifications and Interpretations .29 <br />9 05 Authorized Variations in Work ..29 <br />9.06 Rejecting Defective Work.......... .29 <br />9.07 Shop Drawings, Change Orders and Payments .. ..29 <br />9.08 Determination for Unit Price Work 29 <br />9.09 Decisions on Requirements of Contract Documents and Acceptability of Work. 29 <br />9.10 Limitations on ENGINEER's Authority and Responsibilities... ...... . ............ . .30 <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS... 30 <br />10.01 Authorized Changes in the Work . .30 <br />10.02 Unauthorized Changes in the Work....... .30 <br />10.03 Execution of Change Orders... .... ......... . ........... 30 <br />10.04 Notification to Surety .............. 31 <br />10.05 Claims and Disputes . 31 <br />ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK.. ...... . .. .......... ...32 <br />11 01 Cost of the Work.. 32 <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 3 <br />F\Public Works\ENGINEERING DIVISION PROJECTS\0845B - Old Dixie Hwy Sidewalk (38th Ln - 45th St)Wdmim\bid documents\Master Contract Documents\00700 - General Conditions REV 5-10. <br />13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.