My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Documents, by a mutually agreed lump sum <br /> (which may include an allowance for overhead f. when both additions and credits are <br /> and profit not necessarily in accordance with involved in any one change, the adjustment <br /> paragraph 12 01.C.2); or in CONTRACTOR's fee shall be computed <br /> on the basis of the net change in <br /> 3. where the Work involved is not cov- accordance with paragraphs 12.01 C.2.a <br /> ered by unit prices contained in the Contract through 12.01.C.2.e, inclusive. <br /> Documents and agreement to a lump sum is <br /> not reached under paragraph 12.01 B.2, on the 12 02 Change of Contract Times <br /> basis of the Cost of the Work (determined as <br /> provided in paragraph 11 01) plus a A. The Contract Times (or Milestones) may only <br /> CONTRACTOR's fee for overhead and profit be changed by a Change Order or by a Written <br /> (determined as provided in paragraph 12.01.C) Amendment. Any Claim for an adjustment in the <br /> Contract Times (or Milestones) shall be based on <br /> C. CONTRACTOR's Fee- The written notice submitted by the party making the claim <br /> CONTRACTOR's fee for overhead and profit shall be to the ENGINEER and the other party to the Contract <br /> determined as follows: in accordance with the provisions of paragraph 10.05. <br /> 1. a mutually acceptable fixed fee; or B. Any adjustment of the Contract Times (or <br /> Milestones) covered by a Change Order or of any <br /> 2. if a fixed fee is not agreed upon, then Claim for an adjustment in the Contract Times (or <br /> a fee based on the following percentages of the Milestones) will be determined in accordance with the <br /> various portions of the Cost of the Work: provisions of this Article 12. <br /> a. for costs incurred under para- 12 03 Delays Beyond CONTRACTOR's Control <br /> graphs 1101.A.1 and 1101.A.2, the <br /> CONTRACTOR's fee shall be 15 percent; A. Where CONTRACTOR is prevented from <br /> completing any part of the Work within the Contract <br /> b for costs incurred under paragraph Times (or Milestones) due to delay beyond the control <br /> 11.01.A.3, the CONTRACTOR's fee shall of CONTRACTOR, the . Contract Times (or <br /> be five percent; Milestones)will be extended in an amount equal to the <br /> time lost due to such delay if a Claim is made therefor <br /> c. where one or more tiers of subcon- as provided in paragraph 12.02.A. Delays beyond the <br /> tracts are on the basis of Cost of the Work control of CONTRACTOR shall include, but not be <br /> plus a fee and no fixed fee is agreed upon, limited to, acts or neglect by OWNER, acts or neglect <br /> the intent of paragraph 12.01 C.2.a is that of utility owners or other contractors performing other <br /> the Subcontractor who actually performs work as contemplated by Article 7, fires, floods, <br /> the Work, at whatever tier, will be paid a fee epidemics, abnormal weather conditions, or acts of <br /> of 15 percent of the costs incurred by such God. <br /> Subcontractor under paragraphs 11.01.A.1 <br /> and 11.01.A.2 and that any higher tier 12.04 Delays Within CONTRACTOR's Control <br /> Subcontractor and CONTRACTOR will <br /> each be paid a fee of five percent of the A. The Contract Times(or Milestones)will not be <br /> amount paid to the next lower tier Subcon- extended due to delays within the control of <br /> tractor; CONTRACTOR. Delays attributable to and within the <br /> control of a Subcontractor or Supplier, shall be <br /> d no fee shall be payable on the deemed to be delays within the control of CONTRAC- <br /> basis of costs itemized under paragraphs TOR. <br /> 11 01.A.4, 11 01.A.5, and 11.01.13, <br /> 12.05 Delays Beyond OWNER's and <br /> e. the amount of credit to be allowed CONTRACTOR's Control <br /> by CONTRACTOR to OWNER for any <br /> change which results in a net decrease in A. Where CONTRACTOR is prevented from <br /> cost will be the amount of the actual net completing any part of the Work within the Contract <br /> decrease in cost plus a deduction in Times (or Milestones) due to delay beyond the control <br /> CONTRACTOR's fee by an amount equal of both OWNER and CONTRACTOR, an extension of <br /> to five percent of such net decrease, and the Contract Times (or Milestones) in an amount <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-35 <br /> F\Public Warks\ENGINEERING DNISION PROJECTSX0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admirn%id documentsWlaster Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.