My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
parties that might entitle CONTRACTOR to be 1. Ten daysafter p eseflf^f�—off—, <br /> paid additionally by OWNER or entitle OWNER AppliGatieR for PayrneRt to- OWNER with <br /> to withhold payment to CONTRACTOR. ENGINEER's reEemmendatien, the—ameun <br /> 4 Neither ENGINEER's review of <br /> CONTRACTOR's Work for the purposes of due will be paid by OWNER tn CQNTR4CTQR <br /> recommending payments nor ENGINEER's <br /> recommendation of any payment, including final D Reduction in Payment <br /> payment, will impose responsibility on <br /> ENGINEER to supervise, direct, or control the 1 OWNER may refuse to make <br /> Work or for the means, methods, techniques, payment of the full amount recommended by <br /> sequences, or procedures of construction, or ENGINEER because. <br /> the safety precautions and programs incident <br /> thereto, or for CONTRACTOR's failure to a. claims have been made against <br /> comply with Laws and Regulations applicable to OWNER on account of CONTRACTOR's <br /> CONTRACTOR's performance of the Work. performance or furnishing of the Work; <br /> Additionally, said review or recommendation will <br /> not impose responsibility on ENGINEER to b Liens have been filed in connection <br /> make any examination to ascertain how or for with the Work, except where <br /> what purposes CONTRACTOR has used the CONTRACTOR has delivered a specific <br /> moneys paid on account of the Contract Price, Bond satisfactory to OWNER to secure the <br /> or to determine that title to any of the Work, satisfaction and discharge of such Liens; <br /> materials, or equipment has passed to <br /> OWNER free and clear of any Liens. c. there are other items entitling OWN- <br /> ER to a set-off against the amount <br /> 5 ENGINEER may refuse to recom- recommended, or <br /> mend the whole or any part of any payment if, <br /> in ENGINEER's opinion, it would be incorrect to d. OWNER has actual knowledge of the <br /> make the representations to OWNER referred occurrence of any of the events enumerated <br /> to in paragraph 14 02.6.2. ENGINEER may in paragraphs 14.02.B.5.a through <br /> also refuse to recommend any such payment 14 02.B.5.c or paragraph 15 02.A. <br /> or, because of subsequently discovered <br /> evidence or the results of subsequent 2. If OWNER refuses to make payment <br /> inspections or tests, revise or revoke any such of the full amount recommended by <br /> payment recommendation previously made, to ENGINEER, OWNER must give <br /> such extent as may be necessary in CONTRACTOR immediate written notice (with <br /> ENGINEER's opinion to protect OWNER from a copy to ENGINEER) stating the reasons for <br /> loss because: such action and promptly pay CONTRACTOR <br /> any amount remaining after deduction of the <br /> a. the Work is defective, or completed amount so withheld. OWNER shall promptly <br /> Work has been damaged, requiring pay CONTRACTOR the amount so withheld, or <br /> correction or replacement; any adjustment thereto agreed to by OWNER <br /> and CONTRACTOR, when CONTRACTOR <br /> b. the Contract Price has been reduced corrects to OWNER's satisfaction the reasons <br /> by Written Amendment or Change Orders, for such action <br /> c. OWNER has been required to correct 3 If it is subsequently determined that <br /> defective Work or complete Work in accor- OWNER's refusal of payment was not justified, <br /> dance with paragraph 13 09; or the amount wrongfully withheld shall be treated <br /> as an amount due as determined by paragraph <br /> d CAIGIAICCCJ Fix aGtual knowledge of 14 02.0 1. <br /> the OGGUrrenGe of any Gf the events eRumer <br /> . 1403 CONTRACTOR's Warranty of Title <br /> C Payment Becomes Due A. CONTRACTOR warrants and guarantees <br /> that title to all Work, materials, and equipment covered <br /> by any Application for Payment, whether incorporated <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-40 <br /> F1Public Works\ENGINEERING DIVISION PROJECTS\08456-Old Dixie Hwy Sidewalk(38th Ln-45th St)VWdmim\bid documentsWaster Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.