My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by CONTRACTOR to ENGINEER with the Application under paragraph 2.07 as adjusted from time to <br /> for such payment. Such payment shall be made time pursuant to paragraph 6 04); <br /> under the terms and conditions governing final <br /> payment, except that it shall not constitute a waiver of 2. CONTRACTOR's disregard of Laws <br /> Claims or Regulations of any public body having <br /> jurisdiction; <br /> 1409 Waiver of Claims <br /> 3 CONTRACTOR's disregard of the <br /> A. The making and acceptance of final payment authority of ENGINEER, or <br /> will constitute. <br /> 4. CONTRACTOR's violation in any <br /> 1. a waiver of all Claims by OWNER substantial way of any provisions of the <br /> against CONTRACTOR, except Claims arising Contract Documents. <br /> from unsettled Liens, from defective Work <br /> appearing after final inspection pursuant to B. If one or more of the events identified in <br /> paragraph 14.06, from failure to comply with the paragraph 15 02.A occur, OWNER may, after giving <br /> Contract Documents or the terms of any special CONTRACTOR (and the surety, if any) seven days <br /> guarantees specified therein, or from written notice, terminate the services of <br /> CONTRACTOR's continuing obligations under CONTRACTOR, exclude CONTRACTOR from the <br /> the Contract Documents; and Site, and take possession of the Work and of all <br /> CONTRACTOR's tools, appliances, construction <br /> 2. a waiver of all Claims by CONTRAC- equipment, and machinery at the Site, and use the <br /> TOR against OWNER other than those same to the full extent they could be used by <br /> previously made in writing which are still CONTRACTOR (without liability to CONTRACTOR for <br /> unsettled. trespass or conversion), incorporate in the Work all <br /> materials and equipment stored at the Site or for <br /> which OWNER has paid CONTRACTOR but which <br /> ARTICLE 15 - SUSPENSION OF WORK AND are stored elsewhere, and finish the Work as OWNER <br /> TERMINATION may deem expedient. In such case, CONTRACTOR <br /> shall not be entitled to receive any further payment <br /> until the Work is finished If the unpaid balance of the <br /> 15 01 OWNER May Suspend Work Contract Price exceeds all claims, costs, losses, and <br /> damages (including but not limited to all fees and <br /> A. At any time and without cause, OWNER may charges of engineers, architects, attorneys, and other <br /> suspend the Work or any portion thereof for a period professionals and all court or arbitration or other <br /> of not more than 90 consecutive days by notice in dispute resolution costs) sustained by OWNER arising <br /> writing to CONTRACTOR and ENGINEER which will out of or relating to completing the Work, such excess <br /> fix the date on which Work will be resumed CON- will be paid to CONTRACTOR. If such claims, costs, <br /> TRACTOR shall resume the Work on the date so losses, and damages exceed such unpaid balance, <br /> fixed CONTRACTOR shall pay the difference to OWNER. <br /> Such claims, costs, losses, and damages incurred by <br /> OWNER will be reviewed by ENGINEER as to their <br /> 6UspeR6i9R if GONTRACTOR makes a Claim therefor reasonableness and, when so approved by <br /> as provided in paragFaph . ENGINEER, incorporated in a Change Order. When <br /> exercising any rights or remedies under this <br /> 15 02 OWNER May Terminate for Cause paragraph OWNER shall not be required to obtain the <br /> lowest price for the Work performed <br /> A. The occurrence of any one or more of the <br /> following events will justify termination for cause. C Where CONTRACTOR's services have been <br /> so terminated by OWNER, the termination will not <br /> 1. CONTRACTOR's persistent failure affect any rights or remedies of OWNER against <br /> to perform the Work in accordance with the CONTRACTOR then existing or which may thereafter <br /> Contract Documents (including, but not limited accrue Any retention or payment of moneys due <br /> to, failure to supply sufficient skilled workers or CONTRACTOR by OWNER will not release CON- <br /> suitable materials or equipment or failure to TRACTOR from liability <br /> adhere to the progress schedule established <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-43 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\Master Contract Documents\00700-General Conditions <br /> REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.