Laserfiche WebLink
SECTION 00800 -SUPPLEMENTARY CONDITIONS <br /> TO THE GENERAL CONDITIONS <br /> Article Title Article Number <br /> Introduction SC - 1.00 <br /> Defined Terms SC —1.01 <br /> Terminology SC — 1.02 <br /> Before Starting Construction SC —2.05 <br /> Preconstruction Conference SC —2.06 <br /> Coordination of Plans, Specifications, and Special Provisions SC — 3.06 <br /> Subsurface and Physical Conditions SC—4.02 <br /> Performance, Payment and Other Bonds SC — 5.01 <br /> Certificates of Insurance SC — 5.03 <br /> CONTRACTOR'S Liability Insurance SC — 5.04 <br /> OWNER's Liability Insurance SC — 5.05 <br /> Property Insurance SC — 5.06 <br /> Waiver of Rights SC — 5.07 <br /> Receipt and Application of Insurance Proceeds SC — 5.08 <br /> Acceptance of Bonds and Insurance; Option to Replace SC— 5.09 <br /> Labor; Working Hours SC —6.02 <br /> Concerning Subcontractors, Suppliers, and Others SC —6.06 <br /> Permits SC— 6.08 <br /> Test and Inspections SC — 13.03 <br /> OWNER May Stop the Work SC — 13.05 <br /> Correction Period SC — 13.07 <br /> Progress Payments SC — 14.02 <br /> Substantial Completion SC— 14.04 <br /> 00800-i <br /> 00800-Supplementary Conditions LAP rev.doc <br /> 00800 iF 1Public WorksIENGINEERING DIVISION PROJECTS1084513-Old Dixie Hwy Sidewalk(38th Ln-45th St)1Hdmimlbid documentslLAP Documents\00800- <br /> Supplementary Conditions LAP rev.doc <br />