My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
paragraph 2 05.6, procedures for handling Shop Drawings and other submittals, <br /> and maintaining required records. Utility companies and others as appropriate <br /> will be requested to attend to discuss and coordinate work. <br /> SC-3.06 Coordination of Plans, Specifications, and Special Provisions <br /> SC-3.06 Add the following new paragraphs immediately after paragraph GC-3.05: <br /> SC-3.06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows: <br /> 1. Written Interpretations <br /> 2. Addenda <br /> 3. Specifications <br /> 4. Supplementary Conditions to the General Conditions <br /> 5. General Conditions <br /> 6. Approved Shop Drawings <br /> 7. Drawings <br /> 8. Referenced Standards. <br /> B. Written/computed dimensions shall govern over scaled dimensions. <br /> SC-4.02 Subsurface and Physical Conditions <br /> SC-4.02 Add the following new paragraphs immediately after paragraph GC-4.02.8: <br /> C. In the preparation of Drawings and Specifications, ENGINEER or ENGINEER's <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site: <br /> Roadway Soil Survey— Old Dixie Highway Sidewalk from 38"' Lane to 45th <br /> Street. <br /> D Reports and drawings itemized in SC-4.02.0 are not included with the Bidding <br /> Documents. Copies may be examined at Indian River County Administration <br /> Building, Public Works, 1801 27th Street, Vero Beach, FL 32960 during <br /> regular business hours. These reports and drawings are not part of the Contract <br /> Documents <br /> SC-5.01 Performance, Payment and Other Bonds <br /> SC-5 01.A. Delete paragraph GC-5.01.A in its entirety and insert the following paragraphs in its <br /> place: <br /> Within fifteen (15) days of receipt of the Contract Documents for execution, the <br /> CONTRACTOR shall furnish a Public Construction Bond in an amount <br /> equal to 100% of the Contract Price. <br /> 1. In lieu of the Public Construction Bond, the CONTRACTOR may furnish <br /> an alternative form of security in the form of cash, money order, certified <br /> check, cashier's check, irrevocable letter of credit or a security as listed in <br /> Part II of F.S. Chapter 625. Any such alternative form of security shall be <br /> for the same purpose, and be for the same amount and subject to the <br /> same conditions as those applicable to the bond otherwise required. The <br /> determination of the value of an alternative form of security shall be made <br /> by the OWNER <br /> 00800-2 <br /> 00800-Supplementary Conditions LAP rev.doc <br /> 00800 217APublic Works\ENGINEERING DIVISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th SI)Wdmim\bid documents\LAP Documents\00800- <br /> Supplementary Conditions LAP rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.