My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC-6.02.6. Add the following paragraphs immediately after paragraph GC-6.02.8: <br /> 1. Regular working hours are defined as Monday through Friday, excluding Indian <br /> River County Holidays, from 7 a.m. to 5 p.m. <br /> 2. Indian River County Holidays are: New Year's Day, Good Friday, Memorial Day, <br /> Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after <br /> Thanksgiving, Christmas Day and the day after Christmas. Working on these <br /> days will not be permitted without prior written permission and approval from the <br /> Construction Coordination Manager. <br /> 3. The CONTRACTOR shall receive no additional compensation for overtime work, <br /> i.e., work in excess of eight hours in any one calendar day or 40 hours in any one <br /> calendar week, even though such overtime work may be required under <br /> emergency conditions and may be ordered by the ENGINEER in writing. <br /> 4. All costs of inspection and testing performed during overtime work by the <br /> CONTRACTOR, which is allowed solely for the convenience of the <br /> CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to the <br /> OWNER to deduct the costs of all such inspection and testing from any <br /> payments otherwise due the CONTRACTOR. <br /> 5. All costs of OWNER's employees and costs of ENGINEER's Consultant resulting <br /> from overtime work by the CONTRACTOR, which is allowed solely for the <br /> convenience of the CONTRACTOR, shall be borne by the CONTRACTOR, and a <br /> credit given to OWNER to deduct all such costs from any payments otherwise <br /> due the CONTRACTOR. <br /> 6. No work shall commence before 7 a.m. or continue after 5 p.m. except in case of <br /> emergency upon specific permission of the ENGINEER. <br /> SC-6.06 Concerning Subcontractors, Suppliers, and Others <br /> SC-6.06.C. Add the following sentence at the end of paragraph GC-6.06.C: <br /> OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or <br /> entity, to the extent practicable, information about amounts paid to CONTRACTOR on <br /> account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or <br /> other individual or entity. <br /> SC-6.08 Permits <br /> SC-6.08 Add the following paragraphs immediately after paragraph GC-6.08.A: <br /> B. The OWNER has obtained the following permits (copies of these permits are <br /> contained in Appendix "A"): None <br /> C. The CONTRACTOR shall obtain and pay for all other required permits and <br /> licenses. The CONTRACTOR shall provide copies of the permits to the <br /> OWNER and ENGINEER and shall comply with all conditions contained in <br /> the permits at no extra cost to the OWNER. <br /> D. The CONTRACTOR shall be familiar with all permit requirements during <br /> construction and shall be responsible for complying with these <br /> requirements. The cost of this effort shall be included in the pay item in <br /> which the work is most closely associated with. <br /> 00800-6 <br /> 00800-Supplementary Conditions LAP rev doc <br /> 00800 6F 1Public Works\ENGINEERING DIVISION PROJECTSM4513-Old Dixie Hwy Sidewalk(38th Ln-45th SI)Wdmimtbid documentsX AP Documents\00800- <br /> Supplementary Conditions LAP rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.