My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 -Work Change Directive <br /> No. <br /> DATE OF ISSUANCE: EFFECTIVE DATE: <br /> OWNER: Indian River County <br /> CONTRACTOR: <br /> Project: Old Dixie Highway Sidewalk Improvements, 38th Lane to 45th Street <br /> OWNER's Contract No. 0845B <br /> Bid No. 2014032 <br /> FM No. 423186-2-58-01 <br /> You are directed to proceed promptly with the following changes: <br /> Description: <br /> Purpose of Work Change Directive. <br /> Attachments: (List documents supporting change) <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of determining change in <br /> Contract Prices Contract Times <br /> ❑ Unit Prices ❑Contractor's Records <br /> j]Lump Sum ❑ Engineer's Records <br /> ❑Other: ❑Other: <br /> ❑By Change Order ❑ By Change Order- <br /> Estimated <br /> rderEstimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br /> Change Directive <br /> $ Substantial Completion: days; <br /> Ready for Final Completion days. <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization authorization. <br /> ACCEPTED RECOMMENDED. APPROVED: <br /> By: By: By: <br /> CONTRACTOR (Signature) ENGINEER (Signature) OWNER (Signature) <br /> Date: Date: Date: <br /> * * END OF SECTION <br /> F\Public Works\ENGINEERING DIVISION PROJECTS\08456-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid <br /> documentsWlaster Contract Documents\00948-Work Change Directive Rev 06-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.