Laserfiche WebLink
38 Samples—Physical examples of steam, liquid petroleum products, telephone or other <br /> materials, equipment, or workmanship that are communications, cable television, water, wastewater, <br /> representative of some portion of the Work and which storm water, other liquids or chemicals, or traffic or <br /> establish the standards by which such portion of the other control systems. <br /> Work will be judged. <br /> 47. Unit Price Work—Work to be paid for on <br /> 39 Shop Drawings—All drawings, diagrams, the basis of unit prices. <br /> illustrations, schedules, and other data or information <br /> which are specifically prepared or assembled by or for 48 Work—The entire completed construction <br /> CONTRACTOR and submitted by CONTRACTOR to or the various separately identifiable parts thereof re- <br /> illustrate some portion of the Work. quired to be provided under the Contract Documents. <br /> Work includes and is the result of performing or <br /> 40 Site—Lands or areas indicated in the providing all labor, services, and documentation <br /> Contract Documents as being furnished by OWNER necessary to produce such construction, and <br /> upon which the Work is to be performed, including furnishing, installing, and incorporating all materials <br /> rights-of-way and easements for access thereto, and and equipment into such construction, all as required <br /> such other lands furnished by OWNER which are by the Contract Documents. <br /> designated for the use of CONTRACTOR. <br /> 49. Work Change Directive—A written <br /> 41 Specifications—That part of the Contract statement to CONTRACTOR issued on or after the <br /> Documents consisting of written technical descriptions Effective Date of the Agreement and signed by <br /> of materials, equipment, systems, standards, and OWNER and recommended by ENGINEER ordering <br /> workmanship as applied to the Work and certain an addition, deletion, or revision in the Work, or <br /> administrative details applicable thereto responding to differing or unforeseen subsurface or <br /> physical conditions under which the Work is to be <br /> 42. Subcontractor—An individual or entity performed or to emergencies. A Work Change <br /> having a direct contract with CONTRACTOR or with Directive will not change the Contract Price or the <br /> any other Subcontractor for the performance of a part Contract Times but is evidence that the parties expect <br /> of the Work at the Site. that the change ordered or documented by a Work <br /> Change Directive will be incorporated in a subse- <br /> 43 Substantial Completion—The time at quently issued Change Order following negotiations by <br /> which the Work (or a specified part thereof) has the parties as to its effect, if any, on the Contract Price <br /> progressed to the point where, in the opinion of or Contract Times. <br /> ENGINEER, the Work (or a specified part thereof) is <br /> sufficiently complete, in accordance with the Contract 50. Written Amendment—A written statement <br /> Documents, so that the Work (or a specified part modifying the Contract Documents, signed by <br /> thereof) can be utilized for the purposes for which it is OWNER and CONTRACTOR on or after the Effective <br /> intended The terms "substantially complete" and Date of the Agreement and normally dealing with the <br /> "substantially completed"as applied to all or part of the nonengineering or nontechnical rather than strictly <br /> Work refer to Substantial Completion thereof. construction-related aspects of the Contract Docu- <br /> ments <br /> 44 Supplementary Conditions—That part of <br /> the Contract Documents which amends or 102 Terminology <br /> supplements these General Conditions. <br /> A. Intent of Certain Terms or Adjectives <br /> 45 Supplier—A manufacturer, fabricator, <br /> supplier, distributor, materialman, or vendor having a 1. Whenever in the Contract Documents the <br /> direct contract with CONTRACTOR or with any terms "as allowed," "as approved," or terms of like <br /> Subcontractor to furnish materials or equipment to be effect or import are used, or the adjectives <br /> incorporated in the Work by CONTRACTOR or any "reasonable," "suitable," "acceptable," "proper," <br /> Subcontractor "satisfactory," or adjectives of like effect or import <br /> are used to describe an action or determination of <br /> 46 Underground Facilities—All underground ENGINEER as to the Work, it is intended that such <br /> pipelines, conduits, ducts, cables, wires, manholes, action or determination will be solely to evaluate, in <br /> vaults, tanks, tunnels, or other such facilities or general, the completed Work for compliance with <br /> attachments, and any encasements containing such the requirements of and information in the Contract <br /> facilities, including those that convey electricity, gases, Documents and conformance with the design <br /> 00700-General Conditions REV 5-10-13.doc <br /> 00700-7 <br /> F-\Public Works\ENGINEERING DNISION PROJECTS\08458-Old Dixie Hwy Sidewalk(38th Ln-45th St)VAdmimlbid documentsWlaster Contract Documents100700-General Conditions <br /> REV 5-10-13.doc <br />