My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01220 <br /> PROGRESS MEETINGS <br /> 1.1 SCOPE <br /> A. Date and Time: <br /> 1. Regular Meetings: As mutually agreed upon by ENGINEER and <br /> CONTRACTOR. <br /> 2. Other Meetings: On call. <br /> B. Place: CONTRACTOR'S office at Project site or other mutually agreed upon <br /> location. <br /> C. ENGINEER shall prepare agenda, preside at meetings, and prepare and <br /> distribute a transcript of proceedings to all parties. <br /> D. CONTRACTOR shall provide data required and be prepared to discuss all items <br /> on agenda. <br /> 1.2 MINIMUM ATTENDANCE <br /> A. CONTRACTOR <br /> B. SUBCONTRACTOR: <br /> When needed for the discussion of a particular agenda item, CONTRACTOR <br /> shall require representatives of Subcontractors or suppliers to attend a meeting. <br /> C. CONSTRUCTION COORDINATION MANAGER <br /> D. OWNER'S representative, if required. <br /> E. Utility Representatives <br /> F. Others as appropriate. <br /> G. Representatives present for each party shall be authorized to act on their behalf. <br /> 1.3 AGENDA <br /> Agenda will include, but will not necessarily be limited to, the following: <br /> 1. Transcript of previous meeting. <br /> 2. Progress since last meeting. <br /> 3. Planned progress for next period. <br /> 4. Problems, conflicts and observations. <br /> 5. Change Orders. <br /> 6. Status of Shop Drawings. <br /> 7. Quality standards and control. <br /> 8. Schedules, including off-site fabrication and delivery schedules. Corrective <br /> measures, if required. <br /> 9. Coordination between parties. <br /> 10. Safety concerns. <br /> 11. Other business. <br /> + + END OF SECTION + + <br /> 01220-1 01220 Progress Meetings <br /> F-\Public Works\ENGINEERING DNISION PROJECTS\08456 - Old Dixie Hwy Sidewalk (38th Ln -45th St)\Admim\bid documents\Master Contract <br /> Documents\01220-Progress Meetings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.