My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br /> A. After receiving approval by the ENGINEER, distribute copies of the <br /> approved initial schedule and all reviewed revisions (updated) to: <br /> 1. Job site file. <br /> 2. Subcontractors. <br /> 3. Other concerned parties. <br /> 4. OWNER (two copies). <br /> 5. ENGINEER <br /> B. In the cover letter, instruct recipients to report promptly to the <br /> CONTRACTOR, in writing, any problems anticipated by the projections <br /> shown in the schedules. <br /> + + END OF SECTION + + <br /> 01310-2 01310 Construction Schedule <br /> F-\Public Works\ENGINEERING DIVISION PROJECTS\08456-Old Dixie Hwy Sidewalk(38th Ln-45th St)Mrnim\bid <br /> documents\Master Contract Documents\01310-Construction Schedule.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.