My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-025B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-025B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 2:07:29 PM
Creation date
4/26/2016 12:26:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/17/2015
Control Number
2015-025B
Agenda Item Number
8.F.
Entity Name
Timothy Rose Construction
Subject
Contract/Specifications Old Dixie Sidewalk Improvements
Part 2
Area
38th Lane to 45th St.
Project Number
0845B
Bid Number
2014032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01610 <br /> TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br /> 1.1 GENERAL <br /> A. Make all arrangements for transportation, delivery and handling of equipment <br /> and materials required for prosecution and completion of the Work. <br /> B. Shipments of materials to CONTRACTOR or Subcontractors shall be delivered <br /> to the site only during regular working hours. Shipments shall be addressed and <br /> consigned to the proper party giving name of Project, street number and city. <br /> Shipments shall not be delivered to OWNER except where otherwise directed. <br /> C. If necessary to move stored materials and equipment during construction, <br /> CONTRACTOR shall move or cause to be moved materials and equipment <br /> without any additional compensation. <br /> 1.2 DELIVERY <br /> A. Arrange deliveries of products in accord with construction schedules and in <br /> ample time to facilitate inspection prior to installation. <br /> B. Coordinate deliveries to avoid conflict with Work and conditions at site and to <br /> accommodate the following: <br /> 1. Work of other contractors, or OWNER. <br /> 2. Limitations of storage space. <br /> 3. Availability of equipment and personnel for handling products. <br /> 4. OWNER'S use of premises. <br /> C. Do not have products delivered to project site until related Shop Drawings have <br /> been approved by the ENGINEER. <br /> D. Do not have products delivered to site until required storage facilities have been <br /> provided. <br /> E. Have products delivered to site in manufacturer's original, unopened, labeled <br /> containers. Keep ENGINEER informed of delivery of all equipment to be <br /> incorporated in the Work. <br /> 01610-1 <br /> F-\Public Works\ENGINEERING DIVISION PROJECTS\08456-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid documents\Master <br /> Contract Documents\01610-Transportation and Handling of Materials and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.