My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-028A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-028A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 3:37:40 PM
Creation date
4/26/2016 2:07:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/17/2015
Control Number
2015-028A
Agenda Item Number
15.A.4
Entity Name
Barth Construction
Subject
Work Order No.4 Design/Build Agreement Phase 1
Fire Station 13
Area
4th St. and 43rd. Ave.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is 4..+• <br />ao IS- 0a8A <br />Indian River County <br />Emergency Services District Board of Commissioners <br />4225 43rd Avenue <br />Vero Beach, Florida 32960 <br />Telephone: (772) 226-3900 FAX. 772-567-9323 <br />Project: <br />Fire Station 13, 4th Street and 43rd Avenue <br />Site Work, Preparation and Improvements <br />Emergency Services District <br />WORK ORDER NO. 4 <br />FOR <br />DESIGN/BUILD AGREEMENT <br />PHASE I <br />WITH <br />Barth Construction, Inc. <br />This Work Order No. 4 is in accordance with the existing DESIGN/BUILD AGREEMENT <br />PHASE I dated December 6, 2012 between Barth Construction, Inc (Design/Builder) and Indian <br />River County (County). This Work Order No 4 amends the agreement as follows: <br />SECTION I — PROJECT LIMITS <br />This Work Order No. 4 is for the Design/Builder to perform work in connection with the Site <br />Work, Preparation and Improvements to the proposed Fire Station 13 located at 4th Street and <br />43rd Avenue. <br />SECTION II - SCOPE OF SERVICES <br />Completion of site development to include; installation of gravity sewer, installation of the offsite <br />force main and connection to IRC FM, restoration of the offsite force main areas, installation of <br />the fire line and DDCV, connection of the water service to new fire station building, installation of <br />new pad mount FPL transformer and underground feeders, installation of the remaining site <br />drainage systems and final grading of site, installation and completion of the site concrete <br />drives, parking and sidewalks, completion of the onsite landscape, sod grassing and irrigation <br />system and construction of a 2 bay, prototype fire station building based upon the drawing set <br />dated August 29, 2014. <br />SECTION III — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed as follows: <br />a. Time for substantial Completion shall be 230 calendar Days from notice to proceed <br />SECTION IV — COMPENSATION <br />The County agrees to pay, and the Design/Builder agrees to accept, for the above described <br />services rendered a total amount of $2,173,047 00 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.