My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-030
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 3:39:19 PM
Creation date
4/26/2016 2:27:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/17/2015
Control Number
2015-030
Agenda Item Number
15.B.4
Entity Name
CDM Smith Inc.
Subject
Work Order No. CCNA-2014WO2
Financial Assurance Reporting
2015 Annual
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The deliverable from Masteller, Moler, Reed & Taylor, Inc. will consist of a survey identifying the <br />dates the field survey was completed. Airspace consumed and remaining airspace based on the <br />survey and the construction and design criteria shall be specifically identified in the financial <br />assurance report. The survey shall also include the results of the volumetric calculations for the <br />Segments II and II1 portions of the Class I landfill, as well as the C&D debris landfill. Deliverables <br />accompanying the survey shall include: <br />A 1 -inch = 50 feet scale contour map for each site with 1 -foot contour intervals in regular weight <br />lines, and 5 -foot contour intervals in bold weight lines. Signed and sealed contour maps will be <br />provided on 24 -inch by 36 -inch paper of each landfill site in 1 -inch = 200 feet scale. A Compact Disc <br />(CD) with ASCII file of the survey data in AutoCAD 2004 will also be provided. <br />For the Class I Landfill (Segment I, II, and II1), the financial assurance report shall include an <br />evaluation of the compaction of the waste and an analysis as to whether Republic Services is <br />meeting its contractual compaction requirements. CONSULTANT will include escrow account <br />balance recommendations for Fiscal Year 2014-2015, as well as escrow account budget <br />recommendations for Fiscal Year 2015-2016. <br />A-2 <br />jj1636.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.