Laserfiche WebLink
.AUG 13 J�86 BOOK `'"� 3 6 <br />TO:THE HONORABLE MEMBERS OF DATE: August 4, 1986 FILE: <br />THE BOARD OF COUNTY COMMISSIONERS <br />THROUGH: <br />L.S. Thomas <br />Acting County Administrator Change Orders <br />SUBJECT: Intersection Improvements 8th <br />James W. Davis, P.E. Street and Old Dixie Hwy. <br />Public Works Director <br />Ralph N. Brescia, P.E. REFERENCES: <br />FROM: County Engineer <br />DESCRIPTION AND CONDITIONS <br />Change orders for the above project are required whereby 260 linear <br />feet of corrugated metal pipe is to be replaced by 40 linear feet of <br />perforated pipe in the Southeast quadrant of the interesection. This <br />became necessary when construction activities by others altered the <br />drainage characteristics of this quadrant. <br />As a result of these change orders, the contract price has been <br />reduced from,$91,589.50 to $87,105.50, a reduction of $4,484.00. <br />RECOMMENDATIONS AND FUNDING <br />Engineering Staff recommends that these change orders be expedited. <br />Commissioner Wodtke asked how much pipe is going to be <br />replaced, and Public Works Director Jim Davis explained that this <br />involves more than just pipe. <br />filter fabric encasement. <br />It includes a rock trench with a <br />Commissioner Wodtke just wanted to make sure that we are <br />getting full credit, and Director Davis assured him we were. <br />ON MOTION by Commissioner Wodtke, SECONDED by <br />Commissioner Bird, the Board unanimously approved <br />Change Orders#1 and #2 to the contrpct with Dennis <br />L. Smith, Inc. for intersection improvements at 8th <br />Street and Old Dixie Highway, resulting in a reduction <br />of the contract price of $4,484. <br />16 <br />