My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-034
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2018 11:21:44 AM
Creation date
4/27/2016 10:52:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Interlocal Agreement
Approved Date
03/03/2015
Control Number
2015-034
Agenda Item Number
8.I
Entity Name
Indian River Farms Water Control District
Subject
Permit and Interlocal Agreement IRC-2
Installation of Force Main
Area
Lateral "D" Canal
Project Number
IRC-2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l•, <br />PERMIT AND INTERLOCAL AGREEMENT <br />(No. IRC -2) <br />THIS PERMIT and INTERLOCAL AGREEMENT, dated this 3rd day of <br />march ,2015 by and between INDIAN RIVER FARMS WATER CONTROL <br />DISTRICT, a drainage district organized and existing under the General Drainage Laws <br />of the State of Florida, whose address is 7305 4th Street, Vero Beach, Florida, hereinafter <br />referred to as the "District", and the INDIAN RIVER COUNTY, a political subdivision <br />of the State of Florida, hereinafter referred to as the "Permittee". <br />NOW, THEREFORE, the District does hereby grant unto the Permittee a permit <br />for a period of sixty (60) months from January 1, 2015, unless sooner terminated as <br />hereinafter provided, to construct, maintain, inspect, operate and repair a 6" PVC force <br />main located 5 feet inside the North right-of-way of the South Relief Canal from U.S. <br />Highway No. 1 easterly to the vicinity of the lift station at the locations and in accordance <br />with the plans and specifications attached hereto and marked "Exhibit A" and signed by <br />the parties and, by reference, made a part hereof, together with the right of ingress and <br />egress on and over the property at said locations; provided, however, that as a condition <br />precedent to the rights herein granted, Permittee agrees to and with the District as <br />follows: <br />1. That the construction and installation of force main has been in exact conformity <br />with the plans prepared by Masteller & Moler Associates, Inc., marked "Exhibit <br />A". <br />2. The rights shall extend only for force main used exclusively by Indian River <br />County (unless otherwise agreed to by District) and belonging to the Permittee <br />and the Permittee shall not have any right to assign or sublet this Permit or any <br />part thereof unto a third party. <br />3. Permittee assumes full responsibility for the construction, operation and <br />maintenance of said force main and shall save and hold harmless District from any <br />expense, loss, damage or claim in regard thereto, and the District assumes and <br />shall have no liability in connection therewith. The parties having expressly <br />negotiated to allocate all risk and expense in connection therewith to Permittee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.