My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-035
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2018 3:59:57 PM
Creation date
4/27/2016 11:04:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Interlocal Agreement
Approved Date
03/03/2015
Control Number
2015-035
Agenda Item Number
8.I.
Entity Name
Indian River Farms Water Control
Subject
Permit and Interlocal Agreement IRC-3
Area
Lateral "G" Canal
Project Number
IRC-3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
District for the maintenance of its laterals, sublaterals and canals and for any <br />similar heavy equipment used by land owners within the District. In any case <br />where the force main crosses a pipe or culvert used for drainage or irrigation <br />purposes, or a pipe or culvert is needed hereafter for drainage or irrigation of <br />adjacent lands, and the same is deemed by District or an adjacent landowner to be <br />required to be installed, repaired or replaced, then upon twenty-four (24) hours' <br />notice, Permittee shall, at Permittee's sole cost and expense, be available at the <br />location of, and arrange for such installation, repair or replacement with personnel <br />and equipment to insure that the force main does not endanger or prevent the <br />installation, repair, replacement or use of pipes or culverts for drainage or <br />irrigation purposes. The District has the right to determine the exact location of <br />the force main within the said right-of-way in order that the location of same shall <br />not interfere with the District's functions and operations and of the District land <br />owners. <br />10. Permittee shall advise District's office prior to commencement or completion of <br />all construction. <br />11. Permittee shall not discharge any pollutants, contaminants or deleterious materials <br />into waters or structures owned or maintained by, or subject to the jurisdiction of <br />District, nor permit anything to obstruct the flow of water, and shall save and hold <br />District harmless from any expense, loss or damage to District or others by any <br />such discharge or obstruction, remedying or removing the same immediately upon <br />request by District. <br />12. This Permit shall exist only so long as Permittee may be in full compliance with <br />all requirements of the Department of Environmental Protection for the State of <br />Florida, as such requirements relate to this project, and if, at any time, the <br />Permittee shall fail to meet such requirements, then this Permit shall, ipso facto, <br />immediately become null and void. <br />13. Permittee, as a condition to the continuance of this Permit, shall reimburse <br />District, immediately on demand, for any reasonable fees for testing or other <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.