Laserfiche WebLink
PERMIT AND INTERLOCAL AGREEMENT <br /> (No. IRC-4) a.0�5• d3� <br /> THIS PERMIT and INTERLOCAL AGREEMENT, dated this 3rd day of <br /> March ,2015 by and between INDIAN RIVER FARMS WATER CONTROL <br /> DISTRICT, a drainage district organized and existing under the General Drainage Laws <br /> of the State of Florida, whose address is 7305 4th Street, Vero Beach, Florida, hereinafter <br /> referred to as the "District", and the INDIAN RIVER COUNTY, a political subdivision <br /> of the State of Florida, hereinafter referred to as the "Permittee". <br /> NOW, THEREFORE, the District does hereby grant unto the Permittee a permit <br /> for a period of sixty months (60) months from January 1, 2015, unless sooner terminated <br /> as hereinafter provided, to construct, maintain, inspect, operate and repair a force main in <br /> District right-of-way along Oslo Road from 27th Street easterly, with two crossing <br /> extensions South across sub-lateral E-8/J-2 canal, to Lateral "J" Canal; the crossing of <br /> Lateral "J" Canal (approximately 100 feet North of Oslo Road Bridge); and force main <br /> North and 5 feet inside the East right-of-way of the Lateral "J" Canal for a distance of <br /> 2,250 lineal feet (0.4261 miles) at the locations and in accordance with the plans and <br /> specifications attached hereto and marked "Exhibit A" and signed by the parties and, by <br /> reference, made a part hereof, together with the right of ingress and egress on and over <br /> the property at said locations; provided, however, that as a condition precedent to the <br /> rights herein granted, Permittee agrees to and with the District as follows: <br /> 1. That the construction and installation of force main has been in exact conformity <br /> with the plans prepared by Masteller & Moler Associates, Inc. marked "Exhibit <br /> A". <br /> 2. The rights shall extend only for force main used exclusively by Indian River <br /> County (unless otherwise agreed to by District) and belonging to the Permittee <br /> and the Permittee shall not have any right to assign or sublet this Permit or any <br /> part thereof unto a third party. <br /> 3. Permittee assumes full responsibility for the construction, operation and <br /> maintenance of said force main and shall save and hold harmless District from any <br /> expense, loss, damage or claim in regard thereto, and the District assumes and <br /> 1 <br />