Laserfiche WebLink
PERMIT AND INTERLOCAL AGREEMENT <br /> (No. IRC-7) <br /> THIS PERMIT and INTERLOCAL AGREEMENT, dated this 3rd day of <br /> March , 201.5 by and between INDIAN RIVER FARMS WATER CONTROL <br /> DISTRICT, a drainage district organized and existing under the General Drainage Laws <br /> of the State of Florida, whose address is 7305 4th Street, Vero Beach, Florida, hereinafter <br /> referred to as the "District", and the INDIAN RIVER COUNTY, a political subdivision <br /> of the State of Florida, hereinafter referred to as the"Permittee". <br /> NOW, THEREFORE, the District does hereby grant unto the Permittee a permit <br /> for a period of sixty (60) months from January 1, 2015, until December 31, 2019, unless <br /> sooner terminated as hereinafter provided, to construct, maintain, inspect, operate and <br /> repair a 10" diameter sanitary sewer force main on, over and across District right-of-way <br /> on the northerly right-of-way of Lateral B-10 Canal between 6th Avenue SW and Sunrise <br /> Drive, for approximately 1,500 lineal feet at the locations and in accordance with the <br /> plans and specifications prepared by Masteller & Moler, Inc. Engineering, Plan Sheets <br /> 33A And 33B of 39, attached hereto and marked "Exhibit A" and signed by the partit.s <br /> and, by reference, made a part hereof,together with the right of ingress and egress on and <br /> over the property at said locations; provided, however,that as a condition precedent to the <br /> rights herein granted, Permittee agrees to and with the District as follows: <br /> 1. That the construction and installation of force main shall be in exact conformity <br /> with the plans prepared by Masteller & Moler Associates, Inc. marked "Exhibit <br /> A". <br /> 2. The rights shall extend only for force main used exclusively by Indian River <br /> County (unless otherwise agreed to by District) and belonging to the Permittee <br /> and the Permittee shall not have any right to assign or sublet this Permit or any <br /> part thereof unto a third party. <br /> 3. Permittee assumes full responsibility for the construction, operation and <br /> maintenance of said force main and shall save and hold harmless District from any <br /> expense, loss, damage or claim in regard thereto, and the District assumes and <br /> shall have no liability in connection therewith. The parties having expressly <br /> negotiated to allocate all risk and expense in connection therewith to Permittee. <br /> 1 <br />