My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-039
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2018 10:36:41 AM
Creation date
4/27/2016 11:36:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Interlocal Agreement
Approved Date
03/03/2015
Control Number
2015-039
Agenda Item Number
8.I.
Entity Name
Indian River Farms Water Control District
Interlocal Agreement
Subject
Permit and Interlocal Agreement No. IRC-8
Replace Water Main
Project Number
IRC-8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3, 13- 15 <br /> 8. T . <br /> PERMIT AND INTERLOCAL AGREEMENT J 7 d f 0/ <br /> (No. IRC-8) Zo/d 63� <br /> THIS PERMIT and INTERLOCAL AGREEMENT, dated this 3rd day of <br /> March , 2015 by and between INDIAN RIVER FARMS WATER CONTROL <br /> DISTRICT, a drainage district organized and existing under the General Drainage Laws <br /> of the State of Florida, whose address is 7305 4th Street, Vero Beach, Florida, hereinafter <br /> referred to as the "District", and the INDIAN RIVER COUNTY, a political subdivision <br /> of the State of Florida, hereinafter referred to as the "Permittee". <br /> NOW, THEREFORE, the District does hereby grant unto the Permittee a permit <br /> for a period of sixty (60) months from January 1, 2015, unless sooner terminated as <br /> hereinafter provided, to construct, maintain, inspect, operate and repair a re-use force <br /> main on, over and across District right-of-way of the Lateral "G" Canal from the South <br /> line of the Northwest '/4 of Section 15, Township 32 South, Range 39 East (Storm Grove <br /> Road-57th Street), northerly to the North line of Section 4, Township 32 South, Range 39 <br /> East(Hobart Road-77th Street) for 15,181 lineal feet (2.875 miles) in accordance with the <br /> plans and specifications for Indian River County Project No. US-95-24-DC, entitled <br /> "Wastewater Interconnect for Hobart to Gifford W.W.T.P.'S", prepared by Carter <br /> Associates Inc., and dated September 10, 1996, made a part hereof by reference, together <br /> with the right of ingress and egress on and over the property at said locations; provided, <br /> however, that as a condition precedent to the rights herein granted, Permittee agrees to <br /> and with the District as follows: <br /> 1. That the construction and installation of force main shall be in exact conformity <br /> with the plans prepared by Carter Associates, Inc., as described above. <br /> 2. The rights shall extend only for force main used exclusively by Indian River <br /> County (unless otherwise agreed to by District) and belonging to the Permittee <br /> and the Permittee shall not have any right to assign or sublet this Permit or any <br /> part thereof unto a third party. <br /> 3. Permittee assumes full responsibility for the construction, operation and <br /> maintenance of said force main and shall save and hold harmless District from any <br /> expense, loss, damage or claim in regard thereto, and the District assumes and <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.