My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-044
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 3:52:51 PM
Creation date
4/27/2016 1:56:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/03/2015
Control Number
2015-044
Agenda Item Number
8.L.
Entity Name
Atkins North America
Subject
Work Order No.1 Wastewater Model Update 2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTINUING CONTRACT AGREEMENT <br />WORK ORDER No. 1 <br />SCOPE OF WORK <br />Indian River County Utility Services <br />Wastewater Hydraulic Model Update <br />SCOPE OF WORK (SOW) <br />Indian River County Utility Services (IRCUS) requires Atkins (Consultant) support for a <br />wastewater transmission system hydraulic model update. The previous update to the wastewater <br />transmission system hydraulic model occurred in 2004. Since then, new development has <br />occurred in the service area requiring additional wastewater infrastructure. IRCUS requires an <br />updated wastewater transmission system hydraulic model that reflects the existing transmission <br />system. <br />The scope is comprised of the following tasks: <br />• Task 1 — Wastewater Transmission System Model Update <br />• Task 2 — Wastewater Transmission System Model Calibration <br />TASK 1 — WASTEWATER MODEL UPDATE <br />1.1 Update Wastewater Infrastructure <br />Obtain, analyze, and incorporate the current development and current flows in the service area. <br />Consultant will utilize existing GIS and record drawing data, as provided by the IRCUS. The <br />hydraulic analysis will include recommended improvements where necessary to the impacted <br />wastewater conveyance system. <br />Task 1.2 Update Current Operational Procedures <br />Update current operational procedures and settings for all lift stations in the wastewater service <br />area (i.e. level settings, pump curves, wet well capacity, etc.). The model will be updated to best <br />simulate field conditions, based on available data provided by IRCUS. <br />Task 1.3 Flow Allocations <br />Consultant will develop a return to sewer rate based on metered water demands compared to <br />wastewater flow data. The calculated percentage will be applied to the metered water demand <br />data allocated in the wastewater hydraulic model. <br />The model will be set up to operate in an extended period simulation (EPS), based on run time, <br />pressure and flow data as provided by IRCUS. A diurnal curve will be developed with peaking <br />factors based on recent historical flow data (water meter data, WW pump station run times and <br />flow meters). Individual pump station diurnals are not anticipated. <br />Projected flow and scenarios will not be included under this SOW. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.