Laserfiche WebLink
• Existing flows required for the model update will be provided by the IRCUS. This may <br />include historical water meter data with a return to sewer rate to estimate flows. <br />• The water meter data is spatially located in GIS and can be allocated to nearest node. <br />• IRCUS will provide the updated plans for the facilities if changes have been made <br />since the last model was created and are not included in the geodatabase. <br />• Hydraulic model includes force mains only (no gravity sewer piping). <br />• Calibration shall be based on selected week's data, as agreed with by the IRCUS. <br />• IRCUS shall provide field data where required. Limited coordination efforts are <br />included in this scope for field coordination. <br />DELIVERABLES <br />Atkins shall provide the following: <br />• Updated calibrated hydraulic model for the wastewater conveyance system in WaterCAD <br />software. Technical Memorandum summarizing the model updates, current wastewater <br />flows, calibration data and recommendations for the existing condition scenarios. <br />SCHEDULE <br />It is assumed that all the requested information in this scope will be provided to the consultant in <br />a timely manner and that this effort will be completed within six (6) months from date of execution <br />of this agreement. <br />COMPENSATION <br />The compensation budget is $53,793.83 as presented in Attachment 1. <br />