My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-044
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 3:52:51 PM
Creation date
4/27/2016 1:56:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/03/2015
Control Number
2015-044
Agenda Item Number
8.L.
Entity Name
Atkins North America
Subject
Work Order No.1 Wastewater Model Update 2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Existing flows required for the model update will be provided by the IRCUS. This may <br />include historical water meter data with a return to sewer rate to estimate flows. <br />• The water meter data is spatially located in GIS and can be allocated to nearest node. <br />• IRCUS will provide the updated plans for the facilities if changes have been made <br />since the last model was created and are not included in the geodatabase. <br />• Hydraulic model includes force mains only (no gravity sewer piping). <br />• Calibration shall be based on selected week's data, as agreed with by the IRCUS. <br />• IRCUS shall provide field data where required. Limited coordination efforts are <br />included in this scope for field coordination. <br />DELIVERABLES <br />Atkins shall provide the following: <br />• Updated calibrated hydraulic model for the wastewater conveyance system in WaterCAD <br />software. Technical Memorandum summarizing the model updates, current wastewater <br />flows, calibration data and recommendations for the existing condition scenarios. <br />SCHEDULE <br />It is assumed that all the requested information in this scope will be provided to the consultant in <br />a timely manner and that this effort will be completed within six (6) months from date of execution <br />of this agreement. <br />COMPENSATION <br />The compensation budget is $53,793.83 as presented in Attachment 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.