My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-071
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 8:54:04 AM
Creation date
4/28/2016 1:39:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/14/2015
Control Number
2015-071
Agenda Item Number
8.E.
Entity Name
Carter Associates
Subject
41st Street and US 1 Intersection Improvements
Work Order No.1
Area
41st, St. and Old Dixie
Project Number
1359
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of County Commissioners <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />Telephone: (772) 567-8000 FAX: 772-778-9391 <br />WORK ORDER NO. 1 (ENGINEERING) <br />FOR <br />PROFESSIONAL CIVIL ENGINEERING SERVICES AGREEMENT <br />WITH <br />CARTER ASSOCIATES, INC. <br />PROJECT: <br />41st Street and U.S. Highway No. 1- Intersection Improvements <br />Indian River County Project No. 1359 <br />o4-14-ao(5 <br />B.E. <br />anis-o1 1 <br />This Work Order No 1 is in accordance with the existing AGREEMENT dated November 15, <br />2011 as amended November 4, 2014 between Carter Associates, Inc (ENGINEER) and Indian <br />River County (COUNTY) This Work Order No 1 amends the Agreement as follows: <br />SECTION I â PROJECT LIMITS <br />This Work Order No 1 is for the ENGINEER to perform all professional services in connection <br />with the design of a portion of 41st Street and U S. Highway No 1, including the intersection of <br />41St Street and Old Dixie Highway and the intersection of 41st Street and U S Highway No. 1. <br />The design will extend approximately 1,100' north, south and west of the intersection of OId <br />Dixie Highway <br />The 41st Street eastbound left turn lane at the approach to OId Dixie Highway will require the <br />paving within the Florida East Coast Railroad (FECRR) right-of-way to be widened It is <br />understood the FECRR will perform the required work to the railroad facility and will perform <br />review and approval of all work within the FECRR right-of-way <br />SECTION II - SCOPE OF SERVICES <br />As agreed upon between ENGINEER and COUNTY, the ENGINEER shall provide Professional <br />services to complete all tasks as outlined in this Work Order No 1, specifically detailed in the <br />attached proposal Exhibit A. <br />SECTION III â TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed as follows: <br />a Within 120 calendar days of Notice to Proceed <br />b. Time of FINAL project completion shall be within 30 calendar days of receipt of the <br />County's review comments from the 100% "Paper Submittal" <br />Fâ˘\Public Works\ENGINEERING DIVISION PROJECTS\1359-41st St_US1 Left Turn Lane\Admin\agenda items\IRC CARTER ENG WO No. 1, 4-15- <br />2015.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.