My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-072
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 8:54:14 AM
Creation date
4/28/2016 1:42:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/14/2015
Control Number
2015-072
Agenda Item Number
8.F.
Entity Name
Carter Associates
Subject
Work Order No. 2
74th Ave. Improvements
Area
Oslo Road to 12th St.
Project Number
1417
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Scope: <br />The Surveyor shall provide Professional Land Surveying services to include the following: <br />I. Horizontal and Vertical Control -field establish horizontal and vertical control along the subject <br />roadway right of way and I.R.F.W.C.D. right of way route. <br />1. Set traverse control points along the approximate 15,200+/- feet of project survey route tied to Florida State Plane <br />Coordinate System (NAD 83/2011). <br />2. Survey ties to the Indian River County Real -Time Kinematic Global Positioning System Control Network. <br />3. Permanent vertical benchmarks will be set either with a nail in tree or power pole; an "X" chiseled or "square" cut <br />in concrete, at 1,000 feet intervals. <br />II. Sectional Ties, Property Corners -Subdivision PRM's and Baseline Control - field observe and <br />record property corners, sectional corners, quarter section corners, tract corners, side -street parcel corners. <br />1. Recover and record all associated section corners, quarter section corners, tract corners, and permanent reference <br />monuments of adjacent platted subdivisions - west of Lateral "C" Canal. <br />2. Set control points (rebars/caps) along an offset (TBD) to the baseline of the right-of-way corridor at an interval <br />distance not to exceed 1000 feet. <br />III. Road Right of Way Topography ā Full Topographic Survey of all above ground improvements and <br />natural features within the Ultimate Right of Way along 74th Avenue, 12th Street and 4th Street associated side <br />roadways as indicated above, including the following: <br />1. Observe and record all paved and unpaved roads including bridge decks, curbs and lane lines. <br />2. Observe and record all driveways, sidewalks and landscaped areas within the right of way. <br />3. Observe and record all mail and news boxes. <br />4. Observe and record fences and / or privacy walls within 20 feet of the right of way line. <br />5. Observe and record any grade breaks (swales, berms, slopes, etc.). <br />6. Observe and record all above ground utilities (power poles, water meters, water valves, riser boxes, cleanouts, <br />etc.). <br />7. Observe and record all storm water drainage structures (pipe culvert inverts, catch basins, spillways, etc.), <br />including inverts of associated pipes outside of the right of way. <br />8. Observe and record all above ground visual sanitary sewer systems (gravity flow or force mains), including <br />inverts of associated pipes outside of the right of way. <br />9. Observe and record all wood lines, tree lines and Oak trees 6 inches and larger within the subject right of way. <br />(Locations of Pine trees, Brazilian Pepper trees or cabbage palms are not included in this proposal) <br />10. Cross-sections will be observed at 100 foot intervals and spot elevations 20 feet either side of right of way limits. <br />IV. I.R.F.W.C.D. Lateral and Sub -Lateral Right of Way Topography ā Top of banks adjacent to all <br />roads surveyed within the corridor will be located at each cross-section. A one-half (1/2) canal cross-section <br />(west top of bank, bottom of bank, toe and centerline of ditch) will be taken every 500 feet. Including the <br />following items: <br />1. Observe and record all paved and unpaved roads used for access by the I.R.F.W.C.D. within the corridor. <br />2. Observe and record all drainage structures (pipe culvert inverts, catch basins, spillways, etc.), including inverts of <br />associated pipes outside of the right of way. <br />3. For the I.R.F.W.C.D. Sub -Lateral Canals C-2 and C-3, observe and record cross-sections at 100 foot intervals. <br />4. For the I.R.F.W.C.D. Lateral C Canal (northeast direction); observe and record cross-section at the P.T. as <br />indicated on furnished aerial map CR -SECT 'A' and at the most northerly tangent section before the canal ties <br />into the Main Canal as indicated on furnished aerial map CR -SECT `B'. <br />5. For the I.R.F.W.C.D. Main Canal; observe and record cross-section at the P.C. for the curve to the North as <br />indicated on furnished aerial map CR -SECT 'C' and at the intersection of the South right of way line of 12th Street <br />and the North right of line of the Main Canal as indicated on furnished aerial map CR -SECT <br />6. All elevations will be referenced to the North American Vertical Datum of 1988 (N.A.V.D. 88) and tied to Indian <br />River County or National Geodetic Survey (N.G.S.) benchmarks. Any Indian River County or N.G.S. benchmark <br />within the project's corridor will be observed, recorded and indicated upon the survey. <br />Jā¢\SURVEY WORK AUTHORIZATIONS\IRC Survey 2014-2015\15-234S_IRC_WO_74th Aver roadway ROW (Oslo to 12thSt)rev031915.doc <br />3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.