Laserfiche WebLink
PROPOSAL o EXHIBIT "A" <br />Continued <br />WORK ORDER NO. 2 — Amendment #1 <br />(Engineering/Survey) Continuing Professional Surveying & Mapping/GIS Services, <br />Contract 1333, 2014-2015 <br />CAI Job. No. 15-234S <br />IRCounty Project No. 1417 <br />IRCounty Contract No. 1333 <br />IRC Work Order No. 2 - Amendment #1 <br />Project Limits: <br />Main Corridor <br />74th Avenue — From 800 feet south of Oslo Road to 200 feet south of 17t Street SW. (+/- 4,700 feet) <br />Indian River Farms Water Control District (I.R.F.W.C.D.) Lateral C Canal — From 800 feet south of Oslo Road to <br />200 feet south of 17th Street SW <br />Side Streets and Sub -Lateral Canals <br />I.R.F.W.C.D. Sub -Lateral C-5 Canal — 200 feet west of 74th Avenue (200 feet) <br />I.R.F.W.C.D. Sub -Lateral C-6 Canal — 200 feet east and west of 74th Avenue (400 feet) <br />Services performed within parts of Sections 25, Township 33 South, Range 38 East, Indian River County, Florida. <br />Project Scope: <br />The Surveyor shall provide Professional Land Surveying services to include the following: <br />I. Horizontal and Vertical Control -field establish horizontal and vertical control along the subject roadway <br />right of way and I.R.F. W.C,D. right of way route. <br />1. Set traverse control points along the approximate 4,700+/- feet of project survey route tied to Florida State Plane <br />Coordinate System (NAD 83/2011). <br />2. Survey ties to the Indian River County Real -Time Kinematic Global Positioning System Control Network. <br />3. Permanent vertical benchmarks will be set either with a nail in tree or power pole; an "X" chiseled or "square" cut <br />in concrete, at 1,000 feet intervals. <br />H. Sectional Ties, Property Corners -Subdivision PRM's and Baseline Control - field observe and record <br />property corners, sectional corners, quarter section corners, tract corners, side -street parcel corners. <br />• 1. Recover and record all associated section corners, quarter section corners, tract corners, and permanent reference <br />monuments of adjacent platted subdivisions - west of Lateral "C" Canal. <br />2. Set control points (rebars/caps) along an offset (TBD) to the baseline of the right-of-way corridor at an interval <br />distance not to exceed 1000 feet. <br />III. Road Right of Way Topography — Full Topographic Survey of all above ground improvements and natural <br />features within the Ultimate Right of Way along 74th Avenue, associated side roadways as indicated above, <br />including the following: <br />1. Observe and record all paved and unpaved roads including bridge decks, curbs and lane lines. <br />2. Observe and record all driveways, sidewalks and landscaped areas within the right of way. <br />3. Observe and record all mail and news boxes. <br />4. Observe and record fences and / or privacy walls within 20 feet of the right of way line. <br />J•\SURVEY WORK AUTHORIZATIONS\IRC Survey 2014-2015\15-234S_IRC_WO_74th Av ROW (Oslo to 17thStSW)-Amend 41 doc <br />2 of 4 <br />