My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-074
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 9:39:30 AM
Creation date
4/28/2016 1:59:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/14/2015
Control Number
2015-074
Agenda Item Number
8.H.
Entity Name
Schulke, Bittle and Stoddard LLC
Subject
G0-Line Transfer Hub Facility
Consultant Contract
Area
1235 16th St.
Alternate Name
FTA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 PHASE 5 - CONSTRUCTION PHASE: <br />.01 The CONSULTANT shall assist the COUNTY with the Contract Administration and <br />Inspections, including: attend progress meetings, review shop drawings and contractors <br />submittals, and provide routine site inspections to verify the work is proceeding in <br />accordance with the plans and specifications for the purposes of certification upon <br />completion of the work. Inspections shall be documented with written reports and digital <br />photographs. The CONSULTANT will coordinate the responsibility for document review, <br />meeting attendance, and inspections with civil engineer, architect and other consultants. The <br />construction period is estimated to be six (6) to eight (8) months, and CA and inspection <br />fees have been estimated by the CONSULTANT based on this time frame, and the tasks and <br />frequency of services listed below. Anticipated tasks / services include: <br />A. Site. <br />1. Coordinate and attend pre -construction meetings. (2) <br />2. Attend progress meetings with contractor (1 / wk) <br />3. Review shop drawings (All) <br />4. Review contractors pay requests (1 / month) <br />5. Periodic inspections of the site work (3+-/ week) <br />6. Substantial completion inspection / punch list (1) <br />7. Review as-builts for adequacy and completeness (1) <br />8. Final inspection / final completion determination (1) <br />9. Prepare final certification submittals for site permits <br />B. Building: <br />1. Coordinate and attend pre -construction meetings. (2) <br />2. Attend progress meeting with contractor (1 / wk) <br />3. Review shop drawings (All) <br />4. Review contractors pay requests (1 / month) <br />5. Periodic inspections of the bldg construction (1 +-/ wk) <br />6. Inspection prior to all concrete pours <br />7. Inspections from Structural and M.E.P. consultants — as needed <br />8. Substantial completion inspection / punch list (1) <br />9. Final inspection / final completion determination (1) <br />C. Changes to Work: Oversee changes to work. field directives. minor plan <br />changes, administer construction change orders. <br />.02 The CONSULTANT shall provide the services of a Commissioning Agent to verify the <br />installation of the Building energy systems. validate that the systems are calibrated and <br />perform according to the "Basis of Design" and Construction Documents, and review the <br />"Operations and Maintenance Manual" (provided by the contractor), and prepare a final <br />Commissioning Plan and report, and submit certification to FGBC that the building systems <br />have been installed, and are calibrated. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.