My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-074
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 9:39:30 AM
Creation date
4/28/2016 1:59:20 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/14/2015
Control Number
2015-074
Agenda Item Number
8.H.
Entity Name
Schulke, Bittle and Stoddard LLC
Subject
G0-Line Transfer Hub Facility
Consultant Contract
Area
1235 16th St.
Alternate Name
FTA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPINION OF PROBABLE COST <br />I. BUILDING COSTS <br />A. Enclosed Building cost ** 1,000 SF a $182.30/SF <br />13. Open/Covered Bldg. cost** 1,800 SF cr $87.50/SF <br />C. Covered Walkway/Pict: Up cost** /1,600 SF r $38.00/SF <br />D. Furniture and Equipment cost** 2.800 SF@ $10.00/SF <br />Sub -Total <br />II. SITE CONSTRUCTION COSTS <br />A. Total Cost (see separate spread sheet) <br />111. CONTINGENCY <br />A. 5% of building and site construction cost <br />I11. PROFESSIONAL FEES <br />B. Engineering / Architecture — design and permitting <br />C. Cost estimating / Contract Admin./ Inspections / Procurement <br />D. FGBC Certification / Commissioning <br />Sub -Total <br />IV. ESTIMATE OF OTHER EXPENSES <br />A. Reimbursable costs (prints. copies. mail. fed ex. etc.)* <br />B. Site Development permit app. fees (see attached schedule)* <br />C. FGBC Certification Application Fee* <br />D. Building department permit application / review fees** <br />Sub -Total <br />V. OTHER COSTS <br />A. \Vater & Sewer Impact Fees and Connection Fees** <br />B COVB Electric Impact/Connection Fees** <br />C. IRC Impact & SR60 Fair Share Interest Fee** <br />D. FTA Admin. Fee** <br />E. IRC Admin. Fees** <br />Sub -Total <br />Grand Total <br />- ESTIMATED. COSTS TO BE PAID DIRECTLY 13Y IRC <br />- ESTIMATED. ACTUAL COSTS TO BE PAID BY CONSULTANT <br />AND REIMBURSED 13Y IRC <br />T13D To be determined by others or at a later date when information is available <br />$182.00.00 <br />$157.500.00 <br />$171,800.00(Removed) <br />$ 28.000.00 <br />S 368,000.00 <br />S566,711.75 <br />$46,735.59 <br />$ 82,420.00 <br />$ 34.400.00 <br />$ 23.750.00 <br />5140,570.00 <br />$ 7.700.00 <br />$ 5.880.00 <br />$ 1.400.00 <br />$ 4.000.00 (Estimate) <br />S 18,980.00 <br />$ 8,478.00 <br />$ 4,777.50 <br />$ 0.00 <br />$ 25,000.00 <br />TBD <br />S 38,255.50 <br />51,179,252.84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.