Laserfiche WebLink
Our File #1341 <br />March 20, 2015 <br />"EXHIBIT 1" <br />AMENDMENT #1 TO WO #8 <br />(Scope of Work) <br />Masteller & Moler, Inc. is requesting an amendment to Work Order #8 which was approved by the <br />Board of County Commissioners on October 21, 2014. The original project involved Engineering <br />Services for the FDEP permit revision, engineering, design, preparation of construction plans, <br />specifications/bid documents, construction observation, and soils engineering for the Blue Cypress <br />Lake new replacement package concrete Wastewater Treatment Plant and modification of the effluent <br />disposal system. <br />This Amendment is for work necessary to submit a Site Plan Application to be approved through Indian <br />River County's (IRC's) Administrative Approval process. The Site Plan will depict the location of the <br />planned structures as well as the supporting infrastructure and site data related to I.R.C. Land <br />Development Code Zoning and Land Use regulations <br />The additional services covered by this Amendment #1 to the project will generally consist of the <br />following: <br />Engineering services necessary to secure Indian River County Community Development "Site Plan" <br />Approval for the new replacement package wastewater treatment plant through the Administrative <br />Permit process. <br />The estimated construction cost of the project as described in this Amendment #1 is unchanged. <br />A brief description of the scope of services and deliverables for Work Order #8, Amendment #1 is <br />provided below: <br />• Scope of Services <br />Utilizing the Construction Plans, we shall develop a Site Plan for the Project for submittal to Indian <br />River County to support obtaining a Site Plan Administrative Approval. The Site Plan shall depict <br />the proposed project on the existing plant site in horizontal relationship to the existing plant (to be <br />demolished) and other site improvements. <br />We shall submit a Pre -application Conference Application and attend the Pre -application meeting <br />prior to Site Plan Submittal. We shall respond to County Comments arising from the Pre - <br />application Conference and submit for Site Plan Approval through the Administrative Permit <br />process, attend meetings, and respond to County Comments as necessary for approval. <br />With the demolition of the existing plant and the installation of a more compact plant design, the site <br />will have less impervious area after construction. As such, it is not anticipated that a County <br />Stormwater Permit will be required and these services are not included in this work authorization. <br />