2015-082
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 9:56:26 AM
Creation date
4/29/2016 11:03:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/21/2015
Control Number
2015-082
Agenda Item Number
8.M.
Entity Name
Close Construction LLC
Subject
Osprey Marsh PC South Algal Nutrient
Removal Facility
Project Number
949
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO. 5 <br />y L8i• I�203 <br />aols-a ea. <br />DATE OF ISSUANCE: <br />EFFECTIVE DATE. <br />OWNER. INDIAN RIVER COUNTY <br />CONTRACTOR: CLOSE CONSTRUCTION, LLC <br />PROJECT. PC South Algal Nutrient Removal Facility <br />OWNER'S PROJECT NUMBER: 949 <br />ENGINEER: INDIAN RIVER COUNTY <br />You are directed to make the following changes in the Contract Documents: <br />Item <br />- <br />Description <br />Increase/Decrease <br />in Contract Price <br />Increase/Decrease <br />in Contract Time <br />(Calendar Days) <br />5.1 <br />Furnish and install submersible pump in existing well, furnish and install <br />hydropneumatic tank and pressure controls, piping, valves, etc. and connect to <br />existing Gorman -Rupp pump Reason' To insure the Gorman -Rupp pump does not <br />lose prime. Due to the long suction line length required by SJRWMD, there is <br />concern that the Gorman -Rupp pump will lose prime, causing significant and <br />continuous maintenance issues. <br />$8,965.00 <br />0.0 <br />5.2 <br />Revise center harvest flume bottom elevation at discharge tie-in point per email <br />description to Close Construction dated 9-5-2014. Reason This revision is <br />necessary due to a conflict in the Construction Drawings. Revising the elevation <br />will make harvesting operations much easier for staff <br />$2,896.03 <br />0.0 <br />5.3 <br />Extend the concrete work pad at the South Relief Canal Pump Station site. <br />Reason To provide a safer work area. <br />$4,270.00 <br />0.0 <br />5.4 <br />Furnish and install Type 316 stainless steel fasteners on the flanged aboveground <br />RO brine line discharge fittings. Reason. To provide more robust corrosion <br />resistance. (The project was bid under Utility Division specifications that did not <br />require Type 316 stainless steel fasteners.) <br />$359 10 <br />0.0 <br />5.5 <br />Furnish and install a single pipe support for the vertical aboveground RO brine line <br />discharge into the headworks structure. Reason- Additional support is needed to <br />resist water forces within the pipeline. <br />$1,507.59 <br />0.0 <br />5.6 <br />Furnish and install an additional 6" well for the recycle water system. The well <br />shall be approximately 100 feet deep with 40 feet of 0.030 slot screen, identical to <br />the three wells installed in Change Order No. 4 Reason. The original well <br />placement design assumed the recycle water system wells would be constructed <br />at 50 foot spacing. SJRWMD requires 100 foot spacing between wells which <br />significantly increases the length of the centrifugal pump's suction pipe, which <br />reduces the flow that can be pulled from each well by the pump. A fourth well is <br />required to provide additional flow capacity <br />$5,885.00 <br />0.0 <br />5.7 <br />Increase the recycle water system pump suction line from 4" diameter to b" <br />diameter Reason. The pump suction pipe must be increased because SJRWMD <br />requires 100 foot spacing between wells, increasing the overall distance of the <br />pump suction line. A larger diameter pipe is necessary to reduce the pump <br />suction head which will allow increased pumping capacity <br />$10,783.45 <br />0.0 <br />5.8 <br />Permit plan revision fee charged by the IRC Building Department. Reason. The <br />electrical design was modified requiring another Building Department review <br />$50.00 <br />0.0 <br />5.9 <br />Delete approximately 14.3 cubic yards of 1" to 3" diameter washed brown river <br />quartz at the South Relief Canal site. Reason. Will be replaced by concrete <br />drive/work slab. <br />($1,760.88) <br />0.0 <br />5.10 <br />Delete approximately 72 square yards of filter fabric at the South Relief Canal site. <br />Reason Will be replaced by concrete drive/work slab. <br />($117.53) <br />0.0 <br />'5.11 <br />Delete approximately 53 square yards of 2" type SP -12.1 asphalt pavement at the <br />South Relief Canal site. Reason: Will be replaced by concrete drive/work slab. <br />($789 47) <br />0.0 <br />5.12 <br />Delete approximately 56 square yards of 8" limerock base at the South Relief <br />Canal site. Reason. Will be replaced by concrete drive/work slab. <br />($374.39) <br />0.0 <br />. .- <br />5.13 <br />Delete approximately 59 square yards of 12" stabilized subgrade at the South <br />Relief Canal site. Reason. Will be replaced by concrete drive/work slab. <br />($148.50) <br />0.0 <br />