Change Order Item 5.4 <br />REQUEST FOR INFORMATION <br />PC SOUTH ALGAL NUTRIENT REMOVAL <br />RFI NO. 594-039 <br />TO: Keith McCuIIy, P.E. COUNTY PROJECT NO. 0949 <br />(IRC Stormwater Engineering Division) <br />FROM: Danny Boromei, Project Manager CLOSE CONSTRUCTION, LLC <br />Danny Boromei, 863.634.4320 SPECIFICATION SECTION: <br />(Job Site Phone Number) <br />DRAWING/DETAIL: <br />(Job Site FAX Number) <br />INFORMATION REQUESTED: At today's progress meeting there was discussion directing CCL to use 316 <br />stainless steel bolts for all flanged connections. The Indian River County Utility Standards direct the use <br />of ASTM A-307 (carbon steel not stainless steel). If the county would like to use stainless, CCL will <br />provide a price for the increase. Please advise which one the county would like us to use. Our estimator, <br />Chris Rossi, pointed to paragraph D of that same section. It reads that flanged joints are to use A307. He <br />indicated once he found the ambiguity, he deferred to the IRC Utility standard. Please clarify. <br />Requested By: Danny Boromei, Project Manager Date: 09.22.2014 <br />Reviewing Agency (As checked below) Date Received Date Returned <br />❑ I R C Stormwater Engineering Div. 9-22-2014 9-29-2014 <br />REPLY: Per the County Utility Standards that were in affect when the proiect was bid, Close Construction <br />is correct. The flange nuts and bolts may be per ASTM A-307. Please provide a change order price to use <br />316 Stainless Steel fasteners in the two locations shown on the attached drawing. These are locations <br />where the flanged connections may or will come in contact with RO concentrate water or spray. <br />Reply By: Keith McCully, P.E. <br />Date: September 29, 2014 <br />ENGINEER's or OWNER's response shall not be considered as a Change Order or Change Directive, nor does it <br />authorize changes in the Contract Sum or Contract Schedule.. <br />Distribution of Copies: <br />Office File <br />Inspector's File <br />F\Public Works\KeithM\Stormwater Projects\PC South Construction\RFI - Request for Information\RFI Answer\RFI 594-039R1 doc <br />