My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-082
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 9:56:26 AM
Creation date
4/29/2016 11:03:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/21/2015
Control Number
2015-082
Agenda Item Number
8.M.
Entity Name
Close Construction LLC
Subject
Osprey Marsh PC South Algal Nutrient
Removal Facility
Project Number
949
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Item 5.4 <br />REQUEST FOR INFORMATION <br />PC SOUTH ALGAL NUTRIENT REMOVAL <br />RFI NO. 594-039 <br />TO: Keith McCully, P.E. COUNTY PROJECT NO. 0949 <br />(IRC Stormwater Engineering Division) <br />FROM: Danny Boromei, Project Manager CLOSE CONSTRUCTION, LLC <br />Danny Boromei, 863.634.4320 SPECIFICATION SECTION: <br />(Job Site Phone Number) <br />(Job Site FAX Number) <br />DRAWING/DETAIL: <br />INFORMATION REQUESTED: At today's progress meeting there was discussion directing CCL to use 316 <br />stainless steel bolts for all flanged connections. The Indian River County Utility Standards direct the use <br />of ASTM A-307 (carbon steel not stainless steel). If the county would like to use stainless, CCL will <br />provide a price for the increase. Please advise which one the county would like us to use. Our estimator, <br />Chris Rossi, pointed to paragraph D of that same section. It reads that flanged joints are to use A307. He <br />indicated once he found the ambiguity, he deferred to the IRC Utility standard. Please clarify. <br />Requested By: Danny Boromei, Project Manager Date: 09.22.2014 <br />Reviewing Agency (As checked below) Date Received Date Returned <br />❑ I R C Stormwater Engineering Div. 9-22-2014 9-29-2014 <br />El <br />REPLY: Per the County Utility Standards that were in affect when the project was bid, Close Construction <br />is correct. The flange nuts and bolts may be per ASTM A-307. Please provide a change order price to use <br />316 Stainless Steel fasteners in the two locations shown on the attached drawing. These are locations <br />where the flanged connections may or will come in contact with RO concentrate water or spray. <br />Reply By: Keith McCully, P.E. <br />Date: September 29, 2014 <br />ENGINEER's or OWNER's response shall not be considered as a Change Order or Change Directive, nor does it <br />authorize changes in the Contract Sum or Contract Schedule. <br />Distribution of Copies: <br />Office File <br />Inspector's File <br />F\Public Works\KeithM\Stormwater Projects\PC South Construction\RFI - Request for Information\RFI Answer\RFI 594-039R1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.