My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-082
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 9:56:26 AM
Creation date
4/29/2016 11:03:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/21/2015
Control Number
2015-082
Agenda Item Number
8.M.
Entity Name
Close Construction LLC
Subject
Osprey Marsh PC South Algal Nutrient
Removal Facility
Project Number
949
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*..1101150 S,../14C1 IlcI11 .J..) <br />PIPING TECHNOLOGY & PRODUCTS, Inc <br />3701 Holmes Road <br />Houston, Texas 77051 <br />U.S.A. <br />Phone : (713) 731-0030 <br />Fax : (713) 731-8640 <br />E-mail : info@pipingtech.com <br />Visit our website at www.pipingtech.com <br />Client :Close Construction, LLC <br />301 NW 4th Avenue <br />Okeechobee <br />USA <br />FL 34972 <br />Quote # : Q-174447 <br />Page 1 / 1 <br />Project : (none) <br />Req # : Figure 80 pipe clamp 12" <br />Date Printed : 11/19/2014 <br />Salesman/ENGR : JAIME HERNANDEZ/JAIME HERNANDEZ <br />Buyer :Chris Rossi <br />Fax # :863.763.6337 <br />Phone #,:863.467.0831 <br />Fmw;l:chrisrossi@closeconstruction.us <br />Final Destination : FL <br />Item # <br />Qty. <br />Tag/Mark # <br />Client Tag # <br />Unit price <br />Ext. price <br />1 <br />1 <br />FIG 80 12" D.I., HDG <br />$481.76 <br />$481.76 <br />Total ---> U.S.$ $481.76 <br />Job Material : Pipe Hanger Hardware <br />Estimated total weight : 60 Lbs <br />Estimated ship date : 2-3 weeks A.R.O./A.R.A.D <br />(If sooner delivery is required, please contact us) <br />Terms : NET 30 WITH APPROVED CREDIT <br />Freight : Prepay & Add <br />(If applicable, freight bill is due within 10 days of invoices.) <br />FOB : Exworks, Houston, TX <br />Price validity : 30 day(s) <br />Remarks : Thank you for allowing us to provide the above quote. Please include the <br />quotation number and the salesperson listed above on all correspondence. <br />(Cancellation fees: 20% if material released to engineering, 60% if material is <br />received/cut, 90% if material is in fab/paint, 100% upon fabrication.) <br />Bidder : <br />JAIME HERNANDEZ <br />Date : 11/19/2014 <br />E-mail does not form part of a legally binding contract or agreement between the recipient and the sender, and communications issued <br />or received by E-mail are not recognized as official correspondence unless confirmed by communication issued in one of the following <br />recognized formats, fetter or courier"or fax" <br />All materials are subject 10 prior sale, final delivery to be confirmed at time of order <br />Piping Technology & Products Inc. and our fully owned subsidiaries Sweco Fab, Inc., U.S. Bellows, Inc., FCI, Inc., Pipe Shields, Inc., <br />and Anchor Darling Enterprises are manufacturers of various high quality engineered products including pipe hangers (variable and <br />constant load and big -tons), expansion joints (thin-wall, thick -wall), mechanical and hydraulic snubbers, pre -insulated pipe supports <br />(cryogenic supports/cold shoes, hot shoes), and code pressure vessels and tanks <br />All products quoted in our product lines are manufactured by PT&P <br />H \VBProj\JQProg\JQReports\PTP-quote rpt 11/19/2014 3:00 14PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.