My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-082
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 9:56:26 AM
Creation date
4/29/2016 11:03:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/21/2015
Control Number
2015-082
Agenda Item Number
8.M.
Entity Name
Close Construction LLC
Subject
Osprey Marsh PC South Algal Nutrient
Removal Facility
Project Number
949
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Item 5.16 <br />From: George Kulczycki <br />To: Nichole Arnold <br />Cc: Keith McCully McCully <br />Subject: Osprey Marsh GKE Change Order <br />Date: Tuesday, December 23, 2014 3:00:13 PM <br />Attachments: jmaae.ong <br />Nichole: <br />I spoke with Keith today regarding the above referenced subject. <br />As you and I discussed today on the phone, we originally anticipated completing this <br />project from start to finish in 30 days. We began the project during the first part of <br />October. Based on our discussion today, the project completion by Close <br />Construction and the turn over to the County will not take place until approximately <br />the end of January. With this additional 3 months and delays in planting added <br />significantly to our work schedule, we need to increase the watering events to 2 <br />times per week, or 24 additional events to carry us through the end of January. <br />This is dependent upon rainfall and turn over timeframe. Price for each watering j <br />event will remain the same as $375 per event, which includes maintenance and <br />repairs. This is under item #5.02 "Irrigation and Watering". <br />In addition to this extended maintenance warranty period, we will need to complete <br />2 additional monthly exotic removal maintenance events. As we discussed today, <br />the original proposal that GKE signed with Close was for $405 per event for this <br />item, which is 6.02 "Exotic Elimination". Just prior to coming under contract with <br />Close, we were with the understanding that we would only be planting the northern <br />1/3 of the site and maintaining that until the balance of the project was completed. <br />The $450 only included the cost to maintain the northern 1/3 of the site. I <br />overlooked that line item at the time. The price for the entire site (10 acres) is <br />$1,250.00 per event, totaling an additional $2,500 for 2 additional events. The <br />additional watering events total is $9,000 for 24 events, which I do not believe that <br />number will be reached based on current conditions. <br />The total GKE requested change order is $11,500. <br />Please let me know if you have any questions. <br />Thanks again for your help. <br />George <br />George R. Kulczycki C.E.C., C.E.S. <br />G.K. Environmental, Inc. <br />155 McKee Lane <br />Vero Beach, FL 32960 <br />Phone: (772)567-9129 <br />Fax: (772)567-6245 <br />Email: gke me.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.