Laserfiche WebLink
Change Order Number 5 <br />Item <br />5 1 Install submersible pump in existing well. $ 8,965 00 <br />See attached breakdown and backup <br />5.2 Center Flume Tie-in Point Modification $ 2,896 03 <br />See attached breakdown <br />5.3 Additional concrete pad at SRCPS $ 4,270.00 <br />See attached breakdown. <br />5.4 Fumish & install 316SS fasteners shown on C15A $ 359.10 <br />See attached breakdown and backup. <br />5.5 Fumish & install single vertical pipe support. $ 1,507.59 <br />See attached breakdown and backup. <br />5 6 Fumish & install add'I 6" well. $ 5,885 00 <br />See attached breakdown and backup. <br />5.7 Increase recycle water system pump suction line diameter $ 10,783.45 <br />See attached breakdown and backup. <br />5.8 Permit plan revision fee $ 50.00 <br />See attached backup. <br />5.9 Delete approx. 14.3cy of river quartz at CPS $ (1,760 88) <br />See attached breakdown and backup. <br />5 10 Delete approx. 72sy of filter fabric at CPS $ (117 53) <br />See attached breakdown and backup. <br />5 11 Delete approx. 53sy of asphalt pavement at CPS $ (789 47) <br />See attached breakdown. <br />5.12 Delete approx. 56sy limerock base at CPS $ (374 39) <br />See attached breakdown and backup. <br />5.13 Delete approx. 59sy subgrade at CPS $ (148 50) <br />See attached breakdown <br />5.14 Add approx. 11If guardrail at CPS $ 251 90 <br />See attached breakdown and backup <br />5 15 Add approx. 171 sy concrete at CPS $ 20,966.00 <br />See attached breakdown and backup <br />5 16 Add'I landscaping events $ 12,650.00 <br />See attached breakdown and backup. <br />5 17 Modifications to control building for code compliance $ 5,418 60 <br />See attached breakdown and backup <br />5.18 Delete Bid Item 3 7 in its entirety - Abandon RO Concentrate piping at $ (2,535 00) <br />South County RO Water Treatment Plant per Sheet OF1 <br />5.19 Remove and dispose of approx. 20 4 SY of deteriorated existing asphalt $ 578.89 <br />at the SRCPS. Part of existing asphalt driveway to the site from 27th <br />Ave is buckling and failing. It will be replaced with concrete (item 5 15) <br />