My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-082
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 9:56:26 AM
Creation date
4/29/2016 11:03:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/21/2015
Control Number
2015-082
Agenda Item Number
8.M.
Entity Name
Close Construction LLC
Subject
Osprey Marsh PC South Algal Nutrient
Removal Facility
Project Number
949
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Number 5 <br />Item <br />5 1 Install submersible pump in existing well. $ 8,965 00 <br />See attached breakdown and backup <br />5.2 Center Flume Tie-in Point Modification $ 2,896 03 <br />See attached breakdown <br />5.3 Additional concrete pad at SRCPS $ 4,270.00 <br />See attached breakdown. <br />5.4 Fumish & install 316SS fasteners shown on C15A $ 359.10 <br />See attached breakdown and backup. <br />5.5 Fumish & install single vertical pipe support. $ 1,507.59 <br />See attached breakdown and backup. <br />5 6 Fumish & install add'I 6" well. $ 5,885 00 <br />See attached breakdown and backup. <br />5.7 Increase recycle water system pump suction line diameter $ 10,783.45 <br />See attached breakdown and backup. <br />5.8 Permit plan revision fee $ 50.00 <br />See attached backup. <br />5.9 Delete approx. 14.3cy of river quartz at CPS $ (1,760 88) <br />See attached breakdown and backup. <br />5 10 Delete approx. 72sy of filter fabric at CPS $ (117 53) <br />See attached breakdown and backup. <br />5 11 Delete approx. 53sy of asphalt pavement at CPS $ (789 47) <br />See attached breakdown. <br />5.12 Delete approx. 56sy limerock base at CPS $ (374 39) <br />See attached breakdown and backup. <br />5.13 Delete approx. 59sy subgrade at CPS $ (148 50) <br />See attached breakdown <br />5.14 Add approx. 11If guardrail at CPS $ 251 90 <br />See attached breakdown and backup <br />5 15 Add approx. 171 sy concrete at CPS $ 20,966.00 <br />See attached breakdown and backup <br />5 16 Add'I landscaping events $ 12,650.00 <br />See attached breakdown and backup. <br />5 17 Modifications to control building for code compliance $ 5,418 60 <br />See attached breakdown and backup <br />5.18 Delete Bid Item 3 7 in its entirety - Abandon RO Concentrate piping at $ (2,535 00) <br />South County RO Water Treatment Plant per Sheet OF1 <br />5.19 Remove and dispose of approx. 20 4 SY of deteriorated existing asphalt $ 578.89 <br />at the SRCPS. Part of existing asphalt driveway to the site from 27th <br />Ave is buckling and failing. It will be replaced with concrete (item 5 15) <br />
The URL can be used to link to this page
Your browser does not support the video tag.