Laserfiche WebLink
5.2 Modify center flume tie in point <br />CCL Materials <br />Concrete placement <br />Fabricate & Install Structural aluminum C Channel <br />Sales Tax (Aluminum only) <br />Subtotal <br />Additions <br />1 gallon bituminous paint <br />1 LS <br />1 LS <br />$ 2,200 00 $ 2,200 00 <br />$ 325 00 $ 325 00 <br />7% $ 22 75 <br />$ 2,547.75 <br />1 EA $ 85.00 $ 85 00 <br />Subtotal $ 2,632.75 <br />10% O&P $ 263.28 <br />Total $ 2,896.03 <br />**CCL was concerned about driving large concrete trucks across the existing floway. Therefore <br />it was required to ferry the concrete across the floway using two (2) bobcats. <br />