My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-088
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 10:04:34 AM
Creation date
5/2/2016 10:41:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/05/2015
Control Number
2015-088
Agenda Item Number
8.O.
Entity Name
Southeastern Surveying and Mapping Corp.
Subject
Work Order No.1
Design Survey services
Area
58th Ave.
Project Number
1325
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Mr. David W. Schryver, PSM <br />58th Avenue Route Survey & Approximate R/W <br />March 30, 2015 <br />7. Vertical control will be relative to NAVD'88 Datum. <br />8. Topographic coverage along the 58th Avenue, route will extend a minimum of 10 feet outside <br />of the approximate right-of-way or to the face of a subdivision wall/fence. For all side streets <br />(18 total) along the route, coverage will extend 100 feet from the approximate 58th Avenue <br />right-of-way. <br />The final product will be certified prints and an electronic file of same on disk for your use. <br />Our fee for the above referenced work is outlined on the attached fee schedule. <br />We anticipate completion of the above described work within sixty (60) days after receipt of a written notice <br />to proceed. <br />We look forward to the opportunity to work with you on this project. <br />Sincerely, <br />Bruce C. Ducker, P.S.M. <br />Project Surveyor <br />BCD:gac <br />If the above scope, period of service and method of compensation meets with your approval, please execute <br />below and fax to Southeastern Surveying and Mapping Corporation (SSMC) as notice to proceed along with <br />the notice of commencement. <br />The person executing this document must indicate that he/she is a Principal and/or Corporate Officer. <br />If the signatory is not a Principal and/or Corporate Officer, a Letter of Authorization on company <br />letterhead signed by a Principal and/or Corporate Officer, MUST be provided that specifically states <br />that signatory has the authority to bind the parties by entering into this agreement. <br />ACCEPTED BY: <br />Principal / or Corporate Officer TITLE Printed Name Date <br />t:\proposal\indian river county\route survey _58th ave 57 th st to cr 510_design toporw docx <br />youthefiSttf <br />u <br />weyiRg A <br />
The URL can be used to link to this page
Your browser does not support the video tag.