My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-089
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 10:24:50 AM
Creation date
5/2/2016 11:03:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/05/2015
Control Number
2015-089
Agenda Item Number
8.P.
Entity Name
Kimley-Horn
Subject
Work Order No.1
Design Survey Services
Area
58th Ave.
Project Number
1325
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Board of County Commissioners <br />Administration - Building A <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />Telephone: (772) 567-8000 FAX: 772-778-9391 <br />Project: <br />Indian River Boulevard Sidewalk — (37th Street to 53rd Street) <br />Topographic Design Survey <br />IRC Project No. 1415 <br />WORK ORDER NO. 2 (Engineering/Surveying) <br />FOR <br />PROFESSIONAL SERVICES AGREEMENT <br />ANNUAL SURVEYING and MAPPING SERVICES <br />WITH <br />Kimley-Horn and Associates, Inc <br />In accordance with Contract No 1333 2014-2015 <br />This Work Order No. 2 is in accordance with the existing AGREEMENT dated October 1, 2013, <br />and renewed on October 17, 2014 between Kimley-Horn and Associates, Inc , (SURVEYOR) <br />and Indian River County (COUNTY): <br />SECTION I — PROJECT LIMITS <br />This Work Order No 2 is for the SURVEYOR to perform all related field and office surveying <br />and mapping services in connection with the preparation of a topographic design survey for <br />sidewalk construction over a portion of Indian River Boulevard right-of-way. The survey will <br />begin at the intersection of 37th Street and Indian River Boulevard and extend northerly along <br />Indian River Boulevard to the intersection of Indian River Boulevard and 53rd Street. <br />SECTION II - SCOPE OF SERVICES <br />As agreed upon between SURVEYOR and COUNTY, the SURVEYOR shall provide <br />Professional services to complete all tasks as outlined in this Work Order No 2, specifically <br />detailed in the attached proposal Exhibit A. <br />SECTION III — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed as follows: <br />a 100% "Paper" review submittal (final review prior to request for final deliverables) <br />shall be made within 45 calendar days of receipt of Notice to Proceed for review by <br />County Staff prior to preparing the final submittal package. <br />b Time of FINAL project completion shall be within 10 calendar days of receipt of the <br />County's review comments from the 100% "Paper Submittal". <br />C.\Users\chris.demeter\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\62YG17EF\IRC Kimhey Horn WO No 2 <br />04-09-15.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.