Laserfiche WebLink
Kimley-Horn <br />and Associates, Inc. <br />Kimley-Horn and Associates, Inc. <br />Project. Indian River Blvd Sidewalk Topo from 37th St to 53rd St <br />FILE NO. DATE <br />ESTIMATE COST: $20,195.00 SHEET <br />04/21/15 <br />1 <br />Task Description <br />Profession <br />al Surveyor <br />& Mapper <br />Project <br />Surveyor <br />Survey <br />Technician/ <br />CADD <br />technician <br />Geodetic <br />Processing <br />Technician <br />GIS <br />Specialist <br />GIS <br />Analyst/ <br />Technician <br />Three <br />Man <br />Crew <br />Two Man <br />Crew <br />Two Man - <br />2 GPS unit <br />Crew <br />Clerical <br />Task Totals <br />Research -recover vertical control <br />1 <br />5 <br />73500 <br />Establish Vertical Control through corridor; 2.5 miles <br />2 <br />2 <br />10 <br />1,630 <br />00 <br />Establish additional horizontal control for cross section <br />locations <br />2 <br />10 <br />1,360 <br />00 <br />obtain elevations from east edge of southbound lane to 20' <br />west of west row IR Blvd. at 100' stations (+- 84 sections) <br />42 <br />5,040 <br />00 <br />cut line to row and additional 20' outside of right of way <br />(drainage ditch runs on/just outside of row) <br />30 <br />3,600 <br />00 <br />locate any drainage structures, driveways or improvements <br />along west side IR Blvd from 37th St. to 53rd St. <br />20 <br />2,400 <br />00 <br />download field files <br />11 <br />880 <br />00 <br />draft topgraphic survey in CADD <br />40 <br />3,200 <br />00 <br />QA/QC <br />10 <br />1,350 <br />00 <br />0 <br />00 <br />0 <br />00 <br />0 <br />00 <br />0 <br />00 <br />0 <br />00 <br />0 <br />00 <br />0 <br />00 <br />SUM OF HOURS <br />13 <br />0 <br />55 <br />0 <br />0 <br />0 <br />0 <br />117 <br />0 <br />0 <br />20,195 <br />00 <br />HOURLY RATE <br />$135 00 <br />$120 00 <br />$80 <br />00 <br />$100 <br />00 <br />$120 <br />00 <br />$85 <br />00 <br />$135 <br />00 <br />$120 00 <br />$140.00 <br />$40 00 <br />TOTALS THIS SHEET <br />$1,755 00 <br />$0.00 <br />$4,400 <br />00 <br />$0 <br />00 <br />$0 <br />00 <br />$0 <br />00 <br />$0 <br />00 <br />$14,040 00 <br />$0 00 <br />$0.00 <br />$0 <br />00 <br />$20,195 <br />00 <br />M:MISC\SURVEY\PROPOSALSIR Blvd sidewalk topo 4-21-15.xls <br />