My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-091
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 10:27:38 AM
Creation date
5/3/2016 9:53:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/05/2015
Control Number
2015-091
Agenda Item Number
8.R.
Entity Name
Masteller, Moler & Taylor
Subject
Mapping and Surveying Services
Area
69th St. Left Turn Lane US Highway 1
Project Number
1360
Alternate Name
Work Order No. 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />IRC Work Order No.2 <br />MM&T, Inc. <br />May 5, 2015 <br />Page 2 of 3 <br />b. Time of FINAL project completion shall be within 10 calendar days of receipt of the <br />County's review comments from the 100% "Paper Submittal". <br />2. Deliverables -The SURVEYOR shall provide the COUNTY: <br />a. 100% Phase Submittal for COUNTY review and comment. All submittals shall <br />include one (1) paper "hardcopy" along with Autocad files and an ASCII file for all <br />survey points COUNTY shall strive to provide review comments within 10 calendar <br />days of the preliminary submittal. <br />b. FINAL Deliverables, Four (4) paper "hardcopy" signed and sealed drawing sets. <br />Sheeted and model space (as applicable) AutoCAD drawing file in AutoCad Civil 3D <br />2013, or compatible with AutoCad Civil 3D 2013, PDF formats and an ASCII file for <br />all survey points, all electronic files to be on CD. <br />c. Survey set/sheets shall include a cover sheet with location sketch, survey <br />certifications, and related title and project number; survey notes, legend and <br />abbreviations and plan view sheets. <br />d. Work product and digital versions are to be prepared and submitted so that the <br />COUNTY or other consultants can readily use it for design and analysis of the area, <br />as defined It shall contain all information necessary for a third party surveyor to <br />independently recreate or utilize the survey work. It is acknowledged all final <br />products become property of Indian River COUNTY and will be available for use by <br />the public at large. <br />e. The SURVEYOR'S work product shall meet or exceed the minimum standards <br />defined by Sections II, III and IV or the COUNTY will not approve the SURVEYOR'S <br />request for payment. <br />SECTION IV — COMPENSATION <br />The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for the above described <br />services rendered as identified in Sections I, II, and III of this Work Order No. 2 for a total lump <br />sum fee of $20,115.00 <br />All and/or any additional services not described hereon shall be pre -approved by the <br />COUNTY. Approved additional services shall be invoiced at the rates disclosed in the <br />approved fee schedule with the SURVEYOR for the contract year(s) of October 1, 2014 <br />through September 30, 2015. <br />All invoicing shall include Project Number 1360, Work Order No. 2 (WO 2), Contract Number <br />1333, itemize man-hours and materials expended to complete the scope of services. Payments <br />shall be in accordance with the original Professional Surveying and Mapping/GIS Services <br />Agreement, contract No 1333 with the COUNTY and as stated in Section II, Ill and IV hereon. <br />
The URL can be used to link to this page
Your browser does not support the video tag.