My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/15/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
03/15/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2020 11:15:28 AM
Creation date
5/3/2016 12:35:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/15/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Materials Testing Services Page 3 <br />Old Dixie Highway Resurfacing ■ Indian River County, Florida <br />March 2, 2016 ■ Terracon Proposal No. PHB161007 <br />Contractor QC Testing of Asphaltic Concrete (AC) Pavement <br />We understand that the Contractor is responsible for their own QC testing which shall <br />include performing at least one set of asphalt laboratory tests per day to evaluate the <br />materials and construction during paving. A minimum of three cores shall be cut by the <br />Contractor on daily basis to evaluate the in-place (constructed) density of the structural <br />course construction. The cores will be tested for bulk specific gravity, and the <br />compaction will be evaluated based on the percentage of the bulk specific gravity over <br />the maximum density determined in the plant on the bulk mix materials. As an option, <br />the density (% compaction) of the wearing course construction may be evaluated using <br />a calibrated nuclear gauge if a correction factor can be established using the core <br />densities from the first day of wearing course paving <br />Terracon will not be in the asphalt plant to perform any verification testing during asphalt <br />production. <br />Engineering & Reporting <br />• Engineering oversight and review during the construction to coordinate the <br />aforementioned test program, make site visits, and attend progress meetings. <br />• Submittal of brief engineering reports documenting our findings and test results. <br />Our materials testing services will be provided on an as -needed basis as dictated by the <br />pace and methods of construction. <br />C. COMPENSATION <br />The material testing services provided will be billed in accordance with our current <br />2014-2016 Continuing Geotechnical Services Agreement the line item unit rates <br />illustrated on the Projected Scope and Budget (Attachment A). As stated earlier a four <br />test minimum charge per trip to the site will apply. Terracon proposes to complete the <br />scope of services as described herein for an estimated fee of $37,860 and <br />invoiced on a unit rate basis. If additional services outside the listed project services <br />are required, Terracon will provide such under auspice of a Supplemental Proposal <br />using the same line item unit rates as provided herein. <br />The quantity of the work performed and factors beyond our control, such as weather <br />and the contractor's schedule/efficiency, will affect the actual cost for our services. You <br />will be invoiced at regular intervals but not less than monthly for services performed. <br />1rerracon 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.