My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/2016
CBCC
>
Meetings
>
2010's
>
2016
>
03/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 1:29:27 PM
Creation date
5/3/2016 1:29:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/22/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X t/ Ten sets of complete Conceptual, Preliminary qq �FinalDal plat plans must be signed and sealed by <br /> surveyor). Plans as per Chapter 915,pursuant tbproval being requested. <br /> NIA Any requirements of the zoning or subdivision ordinance which the applicant is requesting to be waived <br /> (such as minimum Iot width and size, street frontage requirements, setbacks, etc.), shall be clearly <br /> indicated by section and paragraph numbers, together with the rationale for the waiver request(s), on an <br /> attached sheet. <br /> i <br /> N/A 2 Aerials for conceptual or preliminary PDs <br /> N/Atemized response to pre-application for conceptual or concurrent applications <br /> X 2 sealed surveys <br /> N/A 3 sets of floor plans and elevation for commercial or multi-family buildings <br /> N/A Written Statement and Photograph of Posted Sign <br /> For Final Plat's only <br /> X v1 CONSTRUCTION COMPLETE-BUILT OUT: <br /> (A) Certificate of Completion from Public Works or copy of letter to Public Works and Utilities <br /> requiring inspection of improvementsEngineer's statement that certificate of <br /> completion will be obtained prior to approval <br /> IF IMPROVEMENTS ARE DEDICATED TO THE PUBLIC: <br /> (B) Original Engineers Certified Cost for Improvements(Signed and Sealed)OR <br /> CONSTRUCTION INCOMPLETE-BONDING OUT: <br /> (A) Original Engineer's Certified Cost Estimate for Improvements(Signed and Sealed) <br /> COPIES OF DOCUMENTS TO BE RECORDED WITH THE FINAL PLAT: <br /> a. Covenants,Deed Restrictions,Bylaws,etc.or Statement There Are None <br /> b. Property Owner's Association Articles of Incorporation or Statement Indicating Why Recording of <br /> POA is Not Required <br /> FACommunity Development\Usex1CurDevlApplications\PDAPP.doc Revised January 2011 q Page 3 of 3 <br /> ATTACHMENT j. 130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.